BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Bremerton, Washington. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Estimated value $300,000,000 - $350,000,000 A state funded project with a condition of award small business enterprise goal of 5% and a veteran business enterprise goal of 2% The Washington State Department of Transportation (WSDOT) plans to replace 29 existing fish barriers within Kitsap County with fish passable structures utilizing a progressive design-build delivery method. This project will replace 29 existing fish barrier crossings on SR 3, SR 104, SR 303, SR3 07 and SR 308 in Kitsap County with fish passable structures (buried structures and bridges) in compliance with the federal injunction regarding fish passage underneath WSDOT highways. This project will be delivered in two phases using the progressive design-build delivery method, Phase 1 will include preliminary engineering and phase 2 will include final design and construction. The project shall include, but is not limited to the following: Determination of the delivery approach for the 29 fish barriers in guaranteed maximum price (GMP) bundles. Providing documentation in support of the environmental review process in which WSDOT is the lead. Provide scoping documents in support of the project. Coordination with WSDOT, the Washington State Department of Fish and Wildlife, and 6 different tribes in determining the best fish passable solution. Acquiring all necessary environmental permits as an authorized agent of WSDOT. Acquiring all necessary property rights as an authorized agent of WSDOT. Providing mitigation solutions for sensitive area impacts. Facilitating temporary and permanent utility adjustment and relocation. Other project elements include, but are not limited to, surveying, construction staging and maintenance of traffic, constructing embankment, grading, retaining walls, stream realignment and restoration, temporary stream bypass, fish exclusion, culvert removal or abandonment, paving, stormwater drainage, signing, erosion and sediment control, and planting. WADOT - SR 3, SR 104, SR 303 and SR 307, Kitsap County Remove Fish Barriers *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$37,451,300.00

Public - State/Provincial

Paving, Site Work

1259

13

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
84
Bidding Soon
2,296
All Active Projects
710
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 8, 2023

July 1, 2025

December 31, 2029

img_map_placeholder

Multiple Locations, Bremerton, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.