EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 25, 2022 at 7:00 PM

Updated January 26, 2024

Demolition and site work for a mixed-use development in San Antonio, Texas. Completed plans call for the demolition of a medical facility; and for site work for a medical facility.

Contract Award Date: Nov 18, 2022 Contract Award Number: 36C25723P0053 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: WB1KNAULH895 Contractor Awarded Name: MCGOLDRICK CONSTRUCTION SERVICES CORPORATION Contractor Awarded Address: SAN ANTONIO, TX 78240 Base and All Options Value (Total Contract Value): $122260.00000000NRM Adding Roof Access from Crosswalk Acquisition Title: Add Roof Access from Crosswalk, Project No. 671-18-121 Contractor shall furnish all necessary labor, materials, equipment, and supervision to completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work to include but not limited to provide roof access at the elevated crosswalk between ALM and Hospital. MAGNITUDE of the Construction Project: Between $100,000.00 - $250,000.00 The Applicable North American Industry Classification System (NAICS) code for this project 238160. This is a "competitive" requirement Set Aside 100% Service Disabled Veteran Owned Business (SDVOSB) only, All offerors must be certified in CVE at the time quotes are submitted. Goals for minority participation for each trade 47.8 % Goals for female participation for each trade 6.9 % Site Visit will be held September 19, 2022 @ 10:00AM CDT. All Interested Contractors shall meet at Audie Murphy VAMC, 7400 Merton Minter Blvd. San Antonio, Tx 78229. Cut off for submission of RFI(s) is September 21, 2022 @ 10:00AM CDT. All RFI(s)/questions must be submitted in Word Format and emailed to the following email address: eileen.myers@va.gov. Please include the solicitation No. 36C25722Q0010 on the subject line. SUBMISSION OF BIDS: All Offerors shall be submitted via email to the following email address: Eileen.Myers@va.gov by the date and time as stated in Block 13 below. All offerors must submit a Bid Guarantee as part of their Bid Package. Additionally, awardee must be able to obtain the required level of Performance and Payment Bonds. The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price. Install Roof Access South Texas Veterans Health Care System (STVHCS) Audie L. Murphy Medical Division Project # 671-18-121 SCOPE OF WORK: The contractor is to furnish all materials, labor, tools, equipment, transportation, and all other incidentals necessary to complete the work outlined in this Scope of Work (SOW) and to turn over to the Government a complete reclaimed/established area and usable system. GENERAL: It is recommended that the contractor attend the site visit to determine the actual quantities required for the work identified in the SOW and to determine in place conditions that will affect the quantities in the delivery order. The contractor is required to attend a Pre-Construction Conference after contract is awarded and prior to issuance of the notice to proceed. The Government will notify the contractor when this conference will be held. It will be the responsibility of the Contractor to protect, remove and repair any damaged items that are not included in the contract; that receive damage as a result of the work being performed. Daily clean up and maintenance of the job site shall also be the responsibility of the Contractor. Contractor should ensure coverage or closure of their dumpster to avoid it being filled with debris by others. All construction materials and equipment shall be secured at the end of each workday by the Contractor as the Government will not be responsible for any damages to equipment or materials left unsecured by the Contractor. Unauthorized access to any area other than the work area is strictly prohibited. Job site safety shall comply with and to all latest OSHA standards. In the event historical or archeological items are found the Contractor shall immediately contact the Contracting Officer and wait for direction on how to proceed. DEMO: The purpose of this project is to provide all labor, equipment and materials to provide roof access at the elevated crosswalk between ALM and University Hospital. This includes, but is not limited to, removal of existing window and wall structure. The Contractor shall haul demoed items off site when their dumpster is full. All environmental regulations should be followed by the contractor during the course of this contract in accordance with Federal Government standards and policies when working on a federal government owned property. PROVIDE ROOF ACCESS AT CROSSWALK: Along with demo, the Contractor shall be responsible for finishing and repairing areas demoed with the same material originally disturbed to return surrounding area to condition acceptable to the VA. New architectural, structural, and electrical components shall be provided in accordance with the A-E drawings and specs. The contractor shall provide as-builts for any new architectural, structural, and electrical components installed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PN - 19.101

Award

Medical

$122,260.00

Public - Federal

Demolition, Site Work

10

12

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Shop Drawings, Product Data, and Samples, Quality Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Floor Plates
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Fire and Smoke Protection, Firestopping, Joint Protection, Expansion Control
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Wood Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Roof Windows and Skylights, Hardware, Door Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Staining and Transparent Finishing, Interior Finishing, Decorative Finishing, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters, Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, HVAC Air Cleaning Devices
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
47
Bidding Soon
2,167
All Active Projects
832
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2022

November 18, 2022

img_map_placeholder

7400 Merton Minter, San Antonio, TX

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Add Roof Access from Crosswalk

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.