BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a day care center in Capitol Heights, Maryland. Conceptual plans call for the renovation of a day care center.

Existing Information: H. Winship Wheatley Regional was constructed in 1970 with additions in 1978 and 1983. The HVAC system is split between the lower (1970) and upper (1978/1983) campuses. The lower campus HVAC system is composed of two hot water boilers that serve a two-pipe system. Downstream equipment consists of heating only incremental units (fan coil units, radiators, convectors and unit ventilators) and all cooling is provided by direct expansion unit ventilators, split systems and/or packaged rooftop units. Two former pod areas are now served by gas fired packaged rooftop units and convectors/fan coil units have been left in place. Air conditioning in the remainder of the lower campus with exception of the gym is provided by window AC units, or remote condensers in unit ventilators. The lower campus gym is served by two ceiling hung heating/ventilating units. The upper campus is served by a separate boiler room with a gas fired hot water boiler. This portion of the campus is also served by a 50 Ton water cooled chiller and cooling tower. Water is delivered by a two-pipe system. Downstream equipment consists of unit ventilators, air handling unit (natatorium) and fan coil units. The upper campus gym is served by two gas fired packaged rooftop units. Original controls are pneumatic with some controls having been upgraded to DDC with replacement units. Scope of Work Overview: The scope of work is to replace the upper campus boiler, piping, downstream units (as identified above) in the upper campus, and provide new dedicated outside air units to provide preconditioned outside air to the entire facility. Scope of work also includes full controls upgrade. The existing sprinkler system will need to be extended to the rest of the facility or replaced in its entirety. A full fire alarm upgrade will be required as well. Affected areas in scope would include full ceiling with LED lighting replacement. Additional work also includes flooring replacement, paint, and IT security infrastructure replacement. The project is included in the 2023-2028 capital improvement plan (CIP). As of September 19, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Day Care Centers

$14,000,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
433
Active Projects
221
Bidding Soon
3,378
All Active Projects
1,302
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 28, 2023

img_map_placeholder

8801 Ritchie Dr, Capitol Heights, MD


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.