BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 23, 2026 at 7:00 PM

Updated February 24, 2026

Demolition, site work and paving for a civil project in Oshawa, Ontario. Design plans call for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a road / highway; and water / sewer project.

Highway 401 Bloor Street / Harmony Road Interchange: Project involves the reconstruction of the Highway 401 Bloor Street / Harmony Road interchange, including the replacement of the Bloor Street Underpass and the Highway 401 / Farewell Creek Bridge, a new structure over Highway 401 to accommodate the reconfigured Highway 401 eastbound off and on-ramps, as well as improvements to retaining walls, noise barriers, drainage, illumination, traffic signals and signage to accommodate the reconfiguration of the interchange. TIMELINE: Designs are ongoing. A Public Information Centre is anticipated in 2026; exact timelines to be confirmed. Project is currently scheduled for 2028 per the Ontario Highways Program. Further update summer 2026.

Design

Roads / Highways

$80,000,000.00

Public - State/Provincial

Demolition, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
814
Active Projects
466
Bidding Soon
5,003
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.