BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Marietta, Georgia. Completed plans call for the renovation of a educational facility.

FTE CAPACITY : 2100 FACILITY CODE : 633-0381 This project consists of, but is not limited to the following: the demolition of the existing finish flooring and base material, the preparation of existing floor substrate, application of leveling compound, application of adhesives and installation of new Vinyl Composition Tile (VCT) / [Luxury Vinyl Tile (LVT) as alternate], Carpeting, and base material including transition strips and accessories as noted. This project consists of, but is not limited to the following: the demolition of the existing finish flooring and base material, the preparation of existing floor substrate, application of leveling compound, application of adhesives and installation of new Vinyl Composition Tile (VCT) / [Luxury Vinyl Tile (LVT) as alternate], Carpeting, and base material including transition strips and accessories as noted. Contract, if awarded, will be on the basis stated in the Instructions to Bidders. No bid may be withdrawn for 60 days after bid opening except within 48 hours if an appreciable error can be shown. Bids must be accompanied by a bid bond made payable to the Cobb County School District, in the amount equal to 5 percent of the bid price. (Certified Checks Not Acceptable.) The successful bidder will be required to furnish a Performance Bond and a Payment Bond acceptable to the Cobb County School District in an amount equal to 100 percent of the contract price and executed by a Surety Company licensed to do business in the State of Georgia and listed in the Department of the Treasury Circular 570, latest edition. The Surety Company shall have an A.M. Best Company minimum rating of "A-" with a financial size of VII "7" or better. Bonds must be accompanied by letter stating the bonding company's current rating for verification before acceptance by the Owner and execution of the formal Owner/Contractor agreement. Bonding of Subcontractors: Include in the Base Bid, Performance and Labor and Materials Payment Bonds, each in 100% of the subcontract sum, for each Subcontractor having a contract of $50,000.00 or more for Roofing, HVAC, Plumbing, Sprinkler System and Electrical Work as required by the General Conditions. Contractor and Subcontractors shall require the Attorney-in-Fact who executes bonds on behalf of sureties to attach a certified, current copy of his Power of Attorney. Cobb County School District reserves the right to award the project on whatever basis is in the interest of the Owner and to accept or reject any or all bids and to waive technicalities and informalities.

Bid Results

Educational

$1,960,016.00

Public - County

Renovation

13

10

23

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
306
Active Projects
151
Bidding Soon
2,134
All Active Projects
995
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 18, 2022

April 1, 2023

August 24, 2023

img_map_placeholder

2601 Shallowford Rd, Marietta, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.