EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 26, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Smithtown, New York. Completed plans call for the renovation of a educational facility; and pre-engineered storage facility.

Public Notice is hereby given that separate sealed bids for BID #22/23-11: 2021 BOND - PHASE 1, PACKET 4 AND PACKET 5 projects will be received. The work shall be as follows: BID #22/23-11: 2021 BOND - PHASE 1, PACKET 4 CONTRACT #2 - GENERAL CONSTRUCTION CONTRACT #3 - ROOF RECONSTRUCTION CONTRACT #5 - PLUMBING RECONSTRUCTION CONTRACT #6 - HVAC RECONSTRUCTION CONTRACT #7 - ELECTRICAL RECONSTRUCTION CONTRACT #8 - FIRE ALARM RECONSTRUCTION BID #22/23-11: 2021 BOND - PHASE 1, PACKET 5 CONTRACT #1 - EXTERIOR DOOR AND WINDOW REPLACEMENT CONTRACT #2 - MASONRY RECONSTRUCTION 58-08-01-06-0-038-028-SMITHTOWN WEST HIGH SCHOOL 58-08-01-06-0-038-029-SMITHTOWN WEST HIGH SCHOOL 58-08-01-06-0-039-002-SMITHTOWN WEST FIELD HOUSE 58-08-01-06-2-091-001-SMITHTOWN WEST STORAGE SHED 58-08-01-06-2-021-001-SMITHTOWN EAST FIELD HOUSE 58-08-01-06-0-023-035-SMITHTOWN EAST HIGH SCHOOL Checks for deposits shall be made payable to the SMITHTOWN CENTRAL SCHOOL DISTRICT All bid addenda will be transmitted to registered plan holders via email and will be available at the above referenced websites. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Plan holders who have obtained hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. The bid deposit shall be refunded to each Bidder only if the plans and specifications are returned, in good condition, with no handwritten notations thereon within (30) calendar days after the bid opening date. All deposits shall be forfeited to the School District after the (30) days have elapsed. ANY PERSON OR CORPORATION WHO FAILS TO SUBMIT A BID SHALL FORFEIT THEIR HARD COPY PLAN DEPOSIT IN ITS ENTIRETY. The SMITHTOWN CENTRAL SCHOOL DISTRICT reserves the right to reject any or all bids submitted, to waive any informality or irregularity in any bid, and/ or to accept any bid in whole or in part and/ or to award or not award the contract, if in the opinion of the SMITHTOWN CENTRAL SCHOOL DISTRICT, the best interest of the SCHOOL DISTRICT will thereby be served. This invitation is an offer to receive bids for a contract. The successful Bidder will be required to execute a formal contract in the form contained in the Contract Documents. All bids received after the time stated in the Notice to Bidders will not be considered and will be returned unopened to the bidder. The bidder assumes the risk of any delay in the mail or in the handling of the mail by employees of the SCHOOL DISTRICT. Whether sent by mail or by means of personal delivery, the bidder assumes responsibility for having its bid deposited on time at the place specified.

Award

Educational

$156,000.00

Public - City

Renovation

99

25

21

10

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Architectural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Sheathing, Underlayment, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Panel Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Tackboards, Signage, Interior Specialties, Partitions, Storage Specialties, Lockers, Storage Assemblies, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furnishings and Accessories, Rugs and Mats, Runners, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Radiators
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation, Integrated Automation Network Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Distributed Communications and Monitoring Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Chain Link Fences and Gates, Retaining Walls, Irrigation, Planting, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
490
Active Projects
278
Bidding Soon
4,387
All Active Projects
2,063
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2022

November 1, 2022

img_map_placeholder

Multiple Locations, Smithtown, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2021 Bond - Phase 1, Packet 4 - Contract #5 - Plumbing Reconstruction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.