BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Winfield, West Virginia. Completed plans call for site work for a water / sewer project.

The contractor is responsible to cover all labor and materials necessary for rebuilding two hydraulic miter gate cylinders including disassembly, examination, replacement and fabrication of components, reassembly, testing, painting, pickup and delivery. The hydraulic cylinder is a miter gate operating cylinder used at Winfield Locks and Dam and is to be installed by others. SCOPE. These Specifications cover all labor and materials necessary for rebuilding two hydraulic miter gate cylinders including disassembly, examination, replacement and fabrication of components, reassembly, testing, painting, pickup and delivery. The hydraulic cylinder is a miter gate operating cylinder used at Winfield Locks and Dam and is to be installed by others. The cylinder dimensions are in metric units with standard units used only as reference. The cylinder bore is 450 mm (17.717) with a 280 mm (11.024) diameter piston rod. The stroke is 4256 mm (13-11.559) with an overall rod length of 5413 mm (17- 9.108). Working pressure is 2000 psi and the test pressure is 3300 psi. Drawing 3-032193 Rev. 09 will be used as reference for component dimensions and assembly. The document labeled INSTRUCTION MANUAL provides descriptions of the parts that make up the cylinder and the part numbers coordinate with those shown on the drawing. Both the drawing and instruction manual are included as attachments to this scope of work. PERFORMANCE. The Contractor will be required to complete work under this contract within fifty (50) calendar days after the day of receipt by him of Notice of Award.DELIVERY. The Contractor is responsible for transporting the cylinder to/from Winfield Locks and Dam 170 Lock Rd. Redhouse, WV 25168 to the contractor's facility. Pickup/Delivery dates need to be coordinated with USACE (Scott Kinzel 304-399-6973 or Robert.S.Kinzel@usace.army.mil). The Contractor shall give ten (10) calendar days notification before pickup/shipment of the cylinder to allow coordination of loading/unloading equipment at the site. QUOTES CAN BE-EMAILED TO philip.s.davis@usace.army.mil. Emailed offers will only be accepted. Mailed offers will not be accepted. Faxed offers cannot be accepted at this time due to COVID-19.

Award

Water / Sewer

$290,000.00

Public - Federal

Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
42
Bidding Soon
415
All Active Projects
155
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2022

October 26, 2022

img_map_placeholder

170 Lock Rd, Winfield, WV

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.