BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 27, 2022 at 8:00 PM

Updated September 15, 2023

Site work and new construction of a civil project in Prescott, Arizona. Conceptual plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

his project is to construct a new booster pump station at the intersection of Meadowridge Drive and Green Lane, and to install 2,020 lineal feet of new twelve (12") inch water main connected to thirty (30") inch water main in Willow Creek Road at Green Lane extending west, to near Green Lane and Meadow Ridge Drive. The project includes upsizing of 3,970 lineal feet of existing water main to new twelve (12") inch water main along Yakashba (west extension of Green Lane) to Peaceful Mesa Drive. As of September 27, 2022, this project is included in the City of Prescott 2023 - 2028 Budget CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$5,250,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
28
Bidding Soon
646
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

Project location map

Multiple Locations, Prescott, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.