BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Boston, Massachusetts. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Description: Viaduct Bridge Repairs and Related Work (Including Painting) Br. Nos. B-16-357, B-16-358, B-16-359, and B-16-369 (Steel) along a Section of Interstate 90 (EB & WB) over the MBTA Railroad Location: Boston Project Type: Bridge - Construction MASSDOT - Viaduct Bridge Repairs and Related Work (Including Painting) Bridge Numbers B-16-357, B-16-358, B-16-359, and B-16-369 (Steel) Along a Section of Interstate 90 P.V. = $62,529,000.00 M/WBE Participation Goal 16% ; Labor participation goals for this Project shall be 15.3% for minorities and 6.9% for women for each job category The work done under this Contract consists of furnishing all necessary labor, materials, equipment and services to repair and preserve the existing viaduct that carries I-90 over the MBTA in the City of Boston. The 0.6-mile-long viaduct begins just east of the former I-90 toll plaza area and ends just west of the Commonwealth Avenue overpass. The viaduct is comprised of four separate bridge structures as designated in MassDOT's bridge inventory: o I-90 Eastbound mainline bridge - Bridge No. B-16-359 (BIN 4RX) o I-90 Westbound mainline bridge - Bridge No. B-16-359 (BIN 4RY) o I-90 Eastbound On-Ramp (Ramp D) - Bridge No. B-16-357 (BIN 4RV) o I-90 Westbound Off-Ramp (Ramp C) - Bridge No. B-16-358 (BIN 4RW) Resetting and replacement of existing steel rocker bearings as required including required temporary shoring and jacking. o Bridge Barrier concrete repairs and selected replacement o Removal and resetting luminaires, replacement of some lighting standards as required, and reconstruction of lighting supports on the structure as required o Installation of new conduit and wiring for the lighting system o Replacement of the existing concrete overlay with new superpave waterproofing overlay o Bridge Deck full and partial depth repairs o Installation of new bolt down median barrier on the bridge o Replacement of bridge deck scuppers and downspouts along the median o Cleaning ofscuppers and downspouts at outer curb lines in both directions of I-90 and Ramps B, C and D

Award

Bridges / Tunnels

$71,672,611.00

Public - State/Provincial

Paving, Site Work

657

17

15

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
358
Active Projects
226
Bidding Soon
2,810
All Active Projects
1,272
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2022

February 13, 2023

img_map_placeholder

I-90, Boston, MA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.