BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Rixeyville, Virginia. Completed plans call for site work for a water / sewer project.

Small Business Set-Aside Award Priority Conventional Onsite Sewage System Installation Project (2022-NWR-24) Address: 8249 Eggbornsville Rd. RixeyvilleVa, 22732 Scope of work: The contractor shall furnish all labor, supervision, equipment, tools, parts, supplies and materials, as necessary, to perform the services as described herein: Cost for Line Item #1 (include total cost for items A-L) These are known factors. Vendors must invoice for actual cost incurred as described herein. A) Construct an onsite sewage system that meets the location and construction specifications of the Virginia Sewage Handling and Disposal Regulations (12VAC5-610-10 et seq., the Regulations). B) Construct the above onsite sewage disposal system in compliance with the Rappahannock- Rapidan Health Department Construction Permit 047-22-117 at 8249 Eggbornsville Rd., Rixeyville, 22737 in the location shown on the permit. The permit may contain additional conditions, notes, and information needed to construct the onsite sewage system. Note: The condition of the Septic Tank has been confirmed that it needs to be replaced. This SOW requires that all bidders include installing a new septic tank and appropriately abandoning the existing tank as per the permit. C) Septic Pump-out Requirements: To prevent sewage from continuing to back up into the home or property surface while waiting for the septic work to start the contents of the existing septic tank shall be pumped by a properly licensed sewer hauler 14 days from signature of the Notice to Proceed and every 21 days thereafter until one week prior to the installation of the system. If the permit requires work within or under the existing drainfield (as indicated in the Permit) the contents of the existing septic tank shall be pumped out every 48 hours for one week prior to the installation or repair of the onsite sewage system in order to dry out the drainfield. D)Tree Removal and Site Clearing: A pre-bid site visit is recommended to determine what if any tree removal or site clearing that may need to occur. Per the above referenced Permit, remove any trees and wood debris as described in the permit and haul away wood and debris unless notified otherwise. Costs of tree removal and site clearing should be included in initial bids. Any additional site clearing or tree removal required during installation must be submitted in writing to and approved by VDH in writing including an additional cost estimate. E) Provide, or subcontract with a licensed plumber and electrician to provide plumbing and electrical required to convey the wastewater from the house to the onsite sewage system as required by the Regulations and the Virginia Uniform Statewide Building Code. This includes obtaining or assuring that the owner obtains all permits and inspections necessary by the local building authority in compliance with the Virginia Uniform Statewide Building Code. F) Obtain a final installation inspection from Suzanne Haldin Private OSE and assure that the onsite sewage system complies with the Regulations. G) Abandon any unused component of the former onsite sewage system as specified by the Rappahannock-Rapidan Health Department Construction Permit 047-22-117. Upon completion of the onsite sewage system repair, the existing 1,000 gallon septic tank shall be pumped by a properly licensed sewage hauler, the tank crushed in place, lime placed over the crushed tank, and the tank hole filled with clean backfill material and restoring the area to its original condition. Abandonment may also include removing unused sewer line and conveyance lines and crushing and filling the distribution box. H) Follow all regulations and permitting pertaining to erosion and sediment control including stabilizing, seeding and grading the site after construction to return to the original state. Control construction runoff with proper practices so as not to become a nuisance to the owner or to neighboring properties or cause sediment to be discharged into state waters and drainage ditches. Any construction debris must also be removed from the site and disposed of properly. I)Bidders shall comply with all requirements of the Department of Professional and Occupational Regulations (DPOR) for contracting and executing the contract with the Virginia Department of Health. Must provide a copy of Class A or B contractors licenses from DPOR, Conventional Sewage Disposal System Contracting (CDS) specialty or Alternative Sewage Disposal System Contracting (ADS) specialty from DPOR, Master Conventional Onsite Sewage System Installer or Master Alternative Onsite Sewage System Installer license from DPOR, and proof of insurance. Bidders contacted by VDH to provide any missing required documents, must provide the document within 24 business hours or their bid will be considered non-responsive. J) Obtain a final installation inspection from Suzanne Haldin Private OSE and assure that the onsite sewage system complies with the Regulations. K) Provide all required documentation to the Rappahannock-Rapidan Health Department following completion of construction and obtain an Operation Permit for the onsite sewage system. L) Submit invoice to VDH_SWAP_Grant@vdh.virginia.gov once Local Health Department has issued the Operations Permit. Additional Services (If Needed) Bidder must contact VDH Project Manager listed on the Notice to Proceed for approval prior to any additional services performed. VDH will issue a change order for actual additional services rendered. The contractor shall furnish all labor, supervision, equipment, tools, parts, supplies and materials, as necessary, to perform the services as described herein: A. Additional materials B. Additional labor and equipment. Breakdown of Total Cost When responding to solicitation Bidders must attach a document listing breakdown of total cost for line item 1. Bidders must attach a separate breakdown of cost for additional services. Additional cost should not be included in line item 1 bid submission. Additional questions: Contact Angelica Cipara via email: angelica.cipara@vdh.virginia.gov Notice to Proceed If Bidder is selected for award, the Bidder shall be required to provide a signed Notice to proceed form within 3 business days of notification. VDH will provide a form for signature.

Bid Results

Water / Sewer

$16,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
60
Bidding Soon
1,738
All Active Projects
728
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2022

November 14, 2022

img_map_placeholder

8249 Eggbornsville Rd, Rixeyville, VA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.