BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Groveland, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Counties: Lake Road Name: Us27 North Intchg (Mp 289)-(Add Lanes) Ramp & Signal Improv Limits: 11470040 Project(s): 43578625201(*) Federal Aid No: N/A Total Roadway Length: 1.078 Miles Contract Days: 165 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.078 Miles Contract Execution Days: 90 Special Start Date: N/A Aquis/Flexible Start Time: 90 Work consists of providing all labor, materials, equipment and incidentals necessary for milling and resurfacing of SR 25 (US27) between MP 26.930 and MP 27.495 at the Turnpike (SR 91) interchange in Lake County. Construction includes adding a new Turnpike SB Left-Turn Exit Ramp, minor pavement widening on the Turnpike SB Exit Ramp, milling and resurfacing of the existing Turnpike ramps, new drainage structures, ITS communication for wrong way counter measures, utility adjustments, signing, pavement marking improvements, and new mast-arm signals on SR 25 (US-27) for the Turnpike SB Left-Turn Exit Ramp and for the Left-Turn to Turnpike NB On-Ramp. No Pre-Bid Conference. Contractor must be prequalified. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 003 - Milling and Resurfacing of SR 25 (US27)

Award

Roads / Highways

$2,596,848.00

Public - State/Provincial

Paving, Site Work

110

5

2

6

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
73
Bidding Soon
1,446
All Active Projects
606
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2022

December 26, 2022

img_map_placeholder

US-27, Groveland, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.