BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Site work, paving and renovation of a mixed-use development in San Francisco, California. Completed plans call for the renovation of a 30,982-square-foot, four-story above grade medical facility; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Chinatown Public Health Center is a vital healthcare hub serving the Chinatown neighborhood, and this project involves the first comprehensive renovation of this essential facility since it was built in 1969. Operated by the San Francisco Department of Public Health, the 30,000-square-foot, three-story facility built over the east entrance to the Broadway Tunnel, offers a wide range of services including dental care, primary care, behavioral health, and child development. This renovation will include full seismic upgrades and major interior demolition to transform the building into a state-of-the-art health facility. Structural improvements- such as new braced frames, modified pile caps, extended grade beams, and reinforced moment connections- will necessitate traffic controls and phased roadway closures. Site upgrades will feature sidewalk improvements, roadway repaving, and utility trenching, including installation of new electrical service. Exterior enhancements include re-roofing, new metal panel finishes, high-performance fenestration replacements, vertical sunshades with maintenance access, and integrated artwork. Interior reconfigurations and comprehensive systems upgrades will improve operational efficiency and overall experience for staff and patients. A corporate surety bond or certified check for ten percent (10%) of the amount bid must accompany each bid. Administrative Code Section 6.22(a) requires all construction greater than $25,000 to include performance and payment bonds for 100% of the contract award. Class "B" license is required to bid. The time allowed for completion is 910 consecutive calendar days. The estimated construction cost is approximately $38,357,086. Question Deadline 10/05/2025 The City may not answer questions received less than 10 calendar days prior to the date for opening Bids. submit the same by email to the Project Engineer/Architect. Right reserved to reject any or all bids and waive any minor irregularities.

GC Bidding

Medical

$43,000,000.00

Public - City

Paving, Renovation, Site Work

631

41

152

6

Subscribe For Documents

94 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
434
Active Projects
217
Bidding Soon
3,136
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2025

February 16, 2026

Project location map

1490 Mason St, San Francisco, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.