BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in San Francisco, California. Working plans call for the renovation of a 8,300-square-foot, two-story above grade medical facility.

Bid Cancelled. Project No- 09B-2173 San Francisco VA Medical Center 4150 Clement St San Francisco, CA 94121 Date: February 9, 2023, Project: Removal and Replacement of Hallway Flooring and Cove base Location: 1B and 2A wings, Building 203. Scope of Work The San Francisco VA Medical Center requires the services of a capable contractor to fulfill a construction requirement consistent with FAR 36.3 to accomplish basic renovations to facilitate an upgrade to outpatient care, and clinical spaces to meet current standards. Objective The nature of this requirement is to mitigate environmental liabilities and replace finishes with no changes to floorplans. These upgrades are to match adjacent areas to the greatest extent possible with the Government Furnished Property (GFP). The total area affected comprises roughly of 8,300 square feet of hallway area contained on wing 1B, and 2A (See Attachment 1 and 2: Floor Layout). Beyond itemized efforts, work is to include removal and disposal of existing contents and subsequent debris. Primary Components of this effort Include: Demolition and Removal of Existing Flooring and Cove Base Preparation of Area for Floor Finish Installation of New Flooring and Cove Base Flooring work is limited to spaces indicated in the Existing Conditions section of this document and as referenced in the attachments. This requirement comprises only of hallway area. Demarcation shall extend to the door frame of each room area within the hallway. Place of Performance All work shall be performed in Bldg. 203, 1B Wing Hallway See Attachment and 2A Wing Hallway as referenced in Attachment 1 and 2. Demolition and Removal Contractor shall provide all personnel, equipment, tools, vehicles, materials, supervision, and other items and services necessary to remove the existing flooring, to include wall base. Vinyl composite tile and mastic are considered potentially asbestos containing materials and are to be abated consistent with California OSHA standards. Disposal manifests are to be provided to the VA for all such quantities. For purposes of bidding, areas may have multiple layers of VCT and two such layers should be assumed for 50% of total impacted areas. Demolition shall be completed in accordance with Specification Section 02 41 00 Demolition (Attachment 3). Preparation Contractor shall provide all personnel, equipment, tools, vehicles, materials, supervision, and other items and services necessary to prepare the floors as specified. Floors are to be floated with self-leveler to ensure a smooth finish and leveling to finished grade of adjacent flooring. Floor leveling material shall be in accordance with specs provided. (See Attachment 4: Specification Section 090516 Surface Preparation). Installation of New Flooring and Cove Base Contractor shall provide all personnel, equipment, tools, vehicles, materials, supervision, and other items and services necessary to install the floors as specified. Contractor shall provide the materials for flooring, which will consist of new Amtico wood laminate flooring, product code W731, or equivalent. Additionally, the Contractor shall be responsible for providing rubber base 6 in height x 1/8 in width. The baseboards shall be rubber with a wood baseboard finish to match the wood laminate flooring. The contractor is responsible as well to provide all appropriate adhesive for both. Material specification must be in accordance with Specification Section 09 65 19 Resilient Flooring (Attachment 6) Submittals All submittals, including but not limited to material and work schedules, shall be submitted via ProCore for governments review. Contractor shall plan and provide government fourteen (14) business days for approval or disapproval. If submittal is disapproved, contractor shall resubmit submittal within seven (7) business days. Existing Conditions, Pertinent Information or Special Considerations: The contractor shall arrange an installation plan and schedule with the Site POC,and obtain an approval from Site POC prior to the commencement of the work. The identified work areas, hallways, are often filled with general pedestrian traffic. The contractor shall anticipate for all lobby and common areas to be occupied during normal business hours. To facilitate and prepare, the contractor shall plan for phasing to allow adjacent rooms to be vacated and returned to service to accommodate subsequent work. For the purposes of planning and phasing, the adjacent rooms will not be in use during the demolition and installation phase. Contractor shall plan phasing dependent upon the size of phased work area to allow for minimal disruption to the users. Each phase spans from removal of existing flooring to installation of new flooring and cove base. Performance of work must be completed within ten (10) calendar days from the start of the phase to the completion of the phase. Schedule shall provide for minimum of five (5) days must be allocated between phases to accommodate VA coordination and actions. Work on the same floor should be performed sequentially to minimize disruption to the users and pedestrians. For scheduling purposes, work may occur concurrently between the two (2) floors. The existing areas are in the 1B, and 2A wings of building 203 on the first floor and second floor. These floors are not ground accessible. Contractor material and contractor personnel access will be limited to designated stairwells and elevators. Asbestos This work is subject to an Infection Control Risk Assessment (ICRA). The Contractor shall provide all personnel, equipment, tools, vehicles, materials, supervision, and other items and services necessary as required for the asbestos treatment in accordance with ICRA, SPECIFICATION SECTION 02 82 13.19, ASBESTOS FLOOR TILE AND MASTIC ABATEMENT (Attachment 5: Abatement Specs). Each work area shall be sealed off with temporary barriers and be operated under negative pressure with HEPA filtered exhaust through exterior windows, and require provisions related to access and waste disposal to mitigate dust. Beyond ICRA requirements, asbestos abatement is extensive and will require isolation with added diligence. All ventilation shall be sealed and entry into the space shall be accommodated with a barrier that extends at least one foot to either side of the entry door. HVAC is to be sealed, with the exterior windows being used for HEPA filtered exhaust. Period of Performance and Performance Hours The period of performance for this requirement is one hundred eighty (180) calendar days from issuance of Notice to Proceed. The period of performance shall begin immediately upon issuance of Notice to Proceed, and all work shall be completed within the time specified, unless extension is granted by the Contracting Officer. Should the contactor decide to perform any of the required services before or after normal duty house, the contractor shall request approval prior to performance from the Site POC. Government Inspection and Acceptance: Government inspection and acceptance shall be conducted after each phase completion. The item shall be considered accepted upon the successful inspection and physical acceptance by the Site POC. Site POC/COR: Site POC for this requirement is Mr. Kelly Wommack, Maintenance Section Chief, Engineering Service, SFVAHCS. Warranty: The Contractor shall provide standard warranty to correct possible defects in contractor provided materials and workmanship. The warranty shall be provided for two (2) years commencing at the time of final acceptance. The Contractor shall provide standard warranty to correct possible defects in contractor provided materials and workmanship. The warranty shall be provided for two (2) years commencing at the time of final acceptance. All Requests for Information (RFIs) regarding this RFP must be submitted in writing and received NLT March 2, 2023, 2:00 P.M. PDT in order to allow replies to reach all prospective offerors in a timely manner. Questions/RFIs shall be sent via email to Carla Groves at carla.groves@va.gov and Daniel Jhun at Daniel.jhun@va.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Medical

$250,000.00

Public - Federal

Renovation

4

8

6

11

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
46
Bidding Soon
1,769
All Active Projects
747
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2023

June 23, 2023

img_map_placeholder

4150 Clement St, San Francisco, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.