Renovation of a water / sewer project in Palmetto, Florida. Completed plans call for the renovation of a water / sewer project.

Master Lift Station N1-B Rehabilitation The deadline to submit all questions, inquiries, or requests concerning interpretation, clarification or additional information pertaining to this Invitation for Bid Construction to the Manatee County Procurement Division is October 7, 2022 Any questions or requests concerning interpretation, clarification or additional information pertaining to this IFBC, including the sample Agreement, shall be made in writing via email to the Manatee County Procurement Division to the Designated Procurement Contact or to purchasing@mymanatee.org. The Contractor shall furnish all labor, superintendence, materials, plant, power, light, heat, fuel, water, tools, appliances, equipment, supplies, shop drawings, working drawings and other means of construction necessary or proper for performing and completing the work. He shall obtain and pay for all required permits necessary for the work.. He shall perform and complete the work in the manner best calculated to promote rapid construction consistent with safety of life and property and to the satisfaction of the County, and in strict accordance with the Contract Documents. The Contractor shall clean up the work and maintain it during and after construction, until accepted, and shall do all work and pay all incidental costs. He shall repair or restore all structures and property that may be damaged or disturbed during performance of the work. This Project, Master Lift Station (MLS) N1-B Rehabilitation, consists of work at the MLS N1-B pump station as identified here: MLS N-1B is located at 2903 69th Court, Palmetto, FL 34221. In general the lift station includes a lift station building, dry-pit pumps, variable frequency drives (VFDs), strapon flow meter, a generator, and multiple electrical elements. Due to aging equipment and decreased future flow demands at MLS N-1B the COUNTY determined a rehabilitation project was appropriate. The work included in this contract consists of the rehabilitation of the Master Lift Station (MLS) N1-B. This involves, but not limited to: a. Furnishing and installing pump replacement of the current dry-pit pumps, motors and variable frequency drives (VFDs). b. Furnishing and installation of an above ground magnetic flow meter on a concrete pad, with associative piping, pipe supports, valving, and other required appurtenance. c. Furnishing and installation a replacement comminutor and control panel. d. Dewatering and cleaning the wet wells. e. Coating repair, as directed by the coating vendor and County Staff for required repairs of the existing coating system. If it is deemed unrepairable, complete coating replacement is a bid additive item. f. Furnishing and installing a precast concrete building, which will house electrical equipment and variable frequency drive. The precast metal building includes an HVAC system, foundation, and other integral systems. g. Demolition and removal of all existing electrical distribution equipment to meet updated NFPA 820 requirements. Equipment being demolished include serv ice main/generator breaker section, switchboard section, motor control center lineup, automatic transfer switch, and existing lighting panel with transformer. The VFD isolation transformer will be demolished and removed as well. h. The existing control panel remote terminal unit (RTU) 90 will be relocated. i. Site work is required, which includes grading, sidewalk, striping and undercutting soil, foundation preparation, demolition of existing concrete pad, open-cut trenching of new force main, and temporary erosion and sediment control. j. The project requires temporary bypass pumping for continuous operations. B. The Contractor shall furnish all shop drawings, working drawings, labor, materials, equipment, tools, services and incidentals necessary to complete all work required by these Specifications and as shown on the Contract Drawings. C. The Contractor shall perform the work complete, in place and ready for continuous service and shall include any repairs, replacements, and/or restoration required as a result of damages caused prior to acceptance by the County. D. The Contractor shall furnish and install all materials, equipment and labor which is reasonably and properly inferable and necessary for the proper completion of the work, whether specifically indicated in the Contract Documents or not.

Award

Water / Sewer

$3,844,969.00

Public - County

Renovation

49

21

11

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
313
Active Projects
124
Bidding Soon
2,225
All Active Projects
885
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 1, 2022

December 12, 2022

August 21, 2023

img_map_placeholder

2903 69th Ct E, Palmetto, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.