BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 22, 2022 at 7:00 PM

Updated September 15, 2023

Site work for a water / sewer project in Morrow, Georgia. Completed plans call for site work for a water / sewer project.

The Board of Regents of the University System of Georgia ("BOR") As ("Owner"), on behalf of the Clayton State University ("CLSU") is soliciting statements of qualifications from firms interested in providing design-build services for the construction of a project known as Project No. J-396, "Campus Infrastructure, Phase II", at Clayton State University, Morrow, Georgia. This Request for Qualifications (RFQ) seeks to identify potential providers of the above-mentioned services. Some firms that respond to this RFQ, who are determined by the Owner to be especially qualified, may be deemed eligible and may be invited to interview and offer proposals for these services. All respondents to this RFQ are subject to instructions communicated in this document, and are cautioned to completely review the entire RFQ and follow instructions carefully. BOR reserves the right to reject any or all statements of qualifications or proposals, and to waive technicalities and informalities at their discretion. Phase II of the campus utility infrastructure project is required to continue the implementation of prioritized renewal and upgrades necessary to ensure adequate function, capacity, and reliability in all campus utility systems. The Phase II scope of work includes but is not limited to the removal and installation of new cold and hot water piping throughout the central academic core - a defined area of the campus. Preliminary conceptual plan of proposed defined work area will be presented to shortlisted firms. The Utility Master Plan will be updated with addenda to Phase II work to include all as-built work and reflect new findings based on Phase II which may inform and assist the University in its future planning efforts. The Guaranteed Maximum Price is estimated at $2,675,000. The preliminary stated cost limitation (SCL) or construction cost of the Project is estimated at $2,500,000. The final SCL may be revised by the Owner due to final programmatic requirements, funding availability or other circumstances. Deadline for written questions/requests for clarification (see section 6). 10/03/22 2:00pm Deadline for finalist submission of written questions and requests for clarification 10/31/22 2:00 PM

Award

Water / Sewer

$538,181.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
303
Active Projects
186
Bidding Soon
2,344
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2022

December 21, 2022

Project location map

2000 Clayton State Blvd, Morrow, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.