Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a water / sewer project in Grande Cache, Alberta. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
Municipal District of Greenview No. 16 (hereafter known as MD Greenview) is in the midst of detailed design of a major upgrade to the existing wastewater treatment facility (WWTF) in the Hamlet of Grande Cache (Grande Cache). The detailed design of the proposed wastewater treatment plant facility is near completion and is ready for construction. The objective of this project is to construct new WWTF components and related upgrades, to provide the residents of Grande Cache with a reliable wastewater treatment facility for years to come. The Grande Cache WWTF design is nearly complete and is ready for construction to improve the overall reliability and effectiveness of the wastewater treatment system. The new WWTF construction consists of the following main infrastructure components: Civil The WWTF civil upgrades consist of the following major components: Construction of a new waterline to the WWTF, ~2,000 m open-cut Including a new PRV station Construction of a new septage receiving station (SRS) inclusive of: Roadway access Site development Storage pond Installation of overflow piping to EQ ponds Installation of yard piping from headworks building to bioreactor, clarifier, UV building, and to effluent manhole Existing sludge pond sludge removal and liner removal Rebuild existing sludge ponds and convert to equalization storage ponds Reshape ponds Install new liner Construction of new equalization pond pump station to return flow back to front of treatment process Site grading, site fence and gate, and road access Excavation for bioreactor, clarifier, building expansion footings, and UV building Backfill for bioreactor, clarifier, building expansion footings, and UV building Structural The WWTF structural upgrades consist of the following major components: Construction of concrete for the following: Extended Bioreactors Concrete pipe and pump gallery Secondary Clarifier Tanks Building expansions UV Building Outfall Generator Pad and Other Construction of new building for: headworks, dewater/chemical room, blower room, electrical room, mechanical room, control room, laboratory, etc. Construction of a new UV Building Construction of pipe and pump gallery access building Installation of Misc. Metals and Materials Grating, hatches, stairs Bioreactor catwalks Clarifier tank covers Process & Building Mechanical The WWTF process & building mechanical upgrades consist of the following major components: Installation of new major equipment: Mechanical Screens complete with washer compactor x 2 Bioreactor Aeration Equipment x2 Secondary Clarifier x2 UV Equipment Biosolids Dewatering (Sludge Press) Installation of various pipe, valves and pumps: RAS pumps WAS pumps MLSS pumps Installation of equalization pond pump station equipment Installation of headworks control gates and composite sampler Installation of alum chemical feed equipment Installation of various analytical instruments Procurement of laboratory equipment Electrical and Instrumentation The WWTF electrical and instrumentation upgrades consist of the following major components: Procurement and installation of the following electrical equipment: Power Distribution Equipment Motor Drives / Starters Generator and ATS Cable Tray & Conduit Trenching, Bedding, Backfill and Compaction Fittings & Fasteners Glanding & Terminations Power Cables Lighting, Building Receptacles and Comms. Utility Coordination Procurement and installation of the following instrumentation: Control & Instrument Cables Control Panel Programming & Integration Instrumentation required throughout the plant HVAC & Plumbing Installation of HVAC and plumbing equipment for new buildings: Headworks (classified space) Dewatering room Blower room Control room / lab Underground pipe and pump gallery UV building
Award
Water / Sewer
$43,577,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2022
January 2, 2023
Grande Cache Wastewater Treatment Facility, Grande Cache, AB
Related To This Project
Grande Cache, AB
Bid Date: May 10 2022
Grande Cache, AB
Bid Date: Feb 23 2024
Grande Cache, AB
Bid Date: Oct 17 2019
Grande Cache, AB
Bid Date: May 20 2022
Grande Cache, AB
Bid Date: Apr 02 2024
Grande Cache, AB
Bid Date: Apr 27 2022
Grande Cache, AB
Bid Date: Apr 29 2022
Grande Cache, AB
Bid Date: Oct 14 2022
Grande Cache, AB
Bid Date: Aug 25 2022
Grande Cache, AB
Bid Date: Oct 14 2022
Calgary, AB
Bid Date: Oct 14 2022
Canmore, AB
Bid Date: Mar 09 2022
Edson, AB
Bid Date: Mar 09 2022
Fort Mackay, AB
Bid Date: Mar 09 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.