BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 20, 2022 at 8:00 PM

Updated January 25, 2024

Renovation of an educational facility in Mayfield, Kentucky. Completed plans call for the renovation of a educational facility.

Generally, the project consists of a complete HVAC renovation to the existing 93,100 sq-ft middle school facility. Work shall consist of demolition, installation of all acoustical ceilings, roofing replacement, metal wall panel installation, water heater replacement, installation of geothermal piping systems, water source heat pumps, ductwork, insulations, dedicated ventilation air systems, HVAC controls, kitchen hood and make-up air systems, installation of electrical power, lighting, and lighting controls. The trades involved include but are not limited to: ceilings, roofing, plumbing, HVAC, mechanical, insulation, geothermal, controls, and electrical. Electronic copies of the documents may be obtained through Paducah Blueprint for $50.00 non-refundable fee. The refundable portion of the deposit will be refunded for the return of complete sets (in usable condition) within fourteen (14) days after the bid opening. NO REFUNDS WILL BE MADE AFTER THE FOURTEEN (14) DAY RETURN PERIOD. TIMES FOR COMPLETION A. Start of Work: It is anticipated that a contract will be awarded soon after the bid opening, but that construction will not start on the project site until March 2023. B. Substantial Completion. Subject to the conditions of Article "Delays and Extensions of Time" of the General Conditions, the total work to be done under this combined construction contract shall be commenced upon execution of the contract agreement and shall be substantially completed in phases no later than July 19, 2024. C. Final Completion. Subject to the conditions of Article "Delays and Extensions of Time" of the General Conditions, the total work to be done under this combined construction contract shall be fully completed in phases no later than within thirty (30) consecutive calendar days from the Date of Substantial Completion .

Post-Bid

Educational

$100,000.00

Public - County

Renovation

84

16

12

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
66
Bidding Soon
650
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2022

November 14, 2022

Project location map

625 Jimtown Rd, Mayfield, KY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.