Site work and new construction of a power facility in New York, New York. Completed plans call for the construction of a power facility; and for site work for a power facility.
**As of November 30, 2022, this project has not yet been awarded. This project will be going to the December 19 and 21, 2022, in MTA Committee and Regular Board Meeting.** *Due to the sensitive nature of the project, reference documents will not be posted. Please obtain documents through the means listed in the invitation to bid.* The Jamaica Substation provides traction power to critical segments of the LIRR Main Line and Atlantic Branch that currently service dense volumes of train traffic that will be increasing as the East Side Access project enters revenue service. The Project will replace the existing substation, which is already operating beyond its useful life. The Design-Builder shall be responsible for all aspects of design, engineering, scheduling, coordination, fabrication, construction, installation and timely completion of the Project. The Work includes, without limitation, (i) site work, including construction of a new retaining wall and foundations; (ii) design, fabrication and installation of new pre-fabricated modular substation buildings housing pre-installed AC switchgear, rectifiers, DC switchgear, control cabinets, programmable logic controllers ("PLC"), supervisory control and data acquisition ("SCADA") systems, security access control and security video management systems, fire alarms, HVAC and associated equipment; (iv) design, furnishing and installation of new transformers outside the new substation buildings; and (v) furnishing and installing high tension feeders, power cables, control cables, fiber optic cables for the PLCs, and other equipment necessary to safely control and monitor the new Jamaica Substation in accordance with the Contract Documents. The Jamaica Substation provides traction power to critical segments of the LIRR Main Line and Atlantic Branch that currently service dense volumes of train traffic that will be increasing as the East Side Access project enters revenue service. The Project will replace the existing substation, which is already operating beyond its useful life. The Design-Builder shall be responsible for all aspects of design, engineering, scheduling, coordination, fabrication, construction, installation and timely completion of the Project. The Work includes, without limitation, (i) site work, including construction of a new retaining wall and foundations; (ii) design, fabrication and installation of new prefabricated modular substation buildings housing pre-installed AC switchgear, rectifiers, DC switchgear, control cabinets, programmable logic controllers ("PLC"), supervisory control and data acquisition ("SCADA") systems, security access control and security video management systems, fire alarms, HVAC and associated equipment; (iv) design, furnishing and installation of new transformers outside the new substation buildings; and (v) furnishing and installing high tension feeders, power cables, control cables, fiber optic cables for the PLCs, and other equipment necessary to safely control and monitor the new Jamaica Substation in accordance with the Contract Documents. The Contract will be a fixed price, lump sum design-build contract. Utilizing a design-build contract is intended to encourage development of innovative designs, planning and logistics while also optimizing the sharing of risks related to the work under the Contract. The Contract will be procured by utilizing a one-step Request for Proposals ("RFP") method. Through the evaluation of the Proposals submitted in response to the RFP, MTA C&D intends to ultimately select a Respondent whose Proposal, in MTA C&D's sole discretion, represents the best value to MTA C&D based on an evaluation of pricing and qualitative factors. While price will be a factor in the evaluation, design, technical approach, schedule, and other qualitative factors will also be considered in determining best value. MTA C&D will first evaluate the written Technical Proposal by each Proposer (which are listed in order of importance): Technical Approach Demonstrated Ability to Meet Contract Schedule Proposer Qualifications and Experience Management Plan Diversity Practices Other Relevant Matters After evaluating the Technical Proposals, the MTA C&D will open the sealed Price Proposals and calculate an adjusted evaluation outcome to determine best value, factoring in both the Price Proposal and the results of the Technical Proposal evaluation. Based on the results of the evaluation scoring, MTA C&D with then enter into negotiations with the highest rated firm or firms. Final selection will be made after negotiations have been concluded and award will be made to the Proposer whose Proposal offers the best value to the MTA. In order to qualify as a responsible proposer, a proposer must be prepared to prove to the satisfaction of the MTA that it has the integrity, skill, experience, facilities, financial resources and stability to successfully and faithfully perform the contract in accordance with the contract documents. Funding: 100% FTA Goals: 22.5% DBE Term:40 Months Est $ Range: $10M - 50M Contract *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Power Plant
$15,000,000.00
Public - State/Provincial
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 28, 2022
June 28, 2023
130-49 92nd Ave, New York, NY
Related To This Project
New York, NY
Bid Date: Oct 28 2022
New York, NY
Bid Date: Nov 18 2022
New York, NY
Bid Date: Apr 05 2022
New York, NY
Bid Date: Nov 15 2022
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
Bid Date: Oct 19 2022
New York, NY
Bid Date: Oct 19 2022
New York, NY
Bid Date: Oct 17 2022
New York, NY
Bid Date: Oct 11 2022
New York, NY
Bid Date: Dec 06 2023
New York, NY
Bid Date: Oct 19 2022
New York, NY
Bid Date: Nov 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.