EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 14, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a transportation facility in Nashville, Tennessee. Completed plans call for the renovation of a transportation facility.

THE PROJECT consists of performing all Work and furnishing all labor, materials, tools, plant equipment and incidentals for the MU1 & MU2 Make-Up Carousel Refurbishment in accordance with the details as shown in the Specifications, or as directed by MNAA or its authorized representative. Bidders must be in good standing with the State of Tennessee and be qualified to meet all Local, State and Federal statutes, codes, regulations, and ordinances governing the performance of the type of Work for which Bidder is submitting a Bid The MU1 & MU2 Make-Up Carousel Refurbishment, 2215 Project will commence January 2023 with completion within the specified number of calendar days. SCOPE. Replace make-up units 1 and 2 in SWA's bag room. Adjustments to lighting, radiant heaters, FIDS, fire protection, and striping. MINIMUM WAGE RATES. The Contractor and Subcontractors shall meet or exceed the prevailing wage rate requirements of the State of Tennessee. Bidders are advised to review the Contract Documents carefully prior to submitting a Bid on the Project. Bidders are also advised to review the Invitation for Bid and Instructions to Bidders carefully prior to preparing their Bids. Bids must be submitted on the Bid Form included in the Contract Documents and the successful Bidder will be required to execute the Construction Contract and other documents requiring execution that are included in the Contract Documents. CONTRACTORS LICENSING ACT OF 1994. All Bidders must be licensed contractors as required by the Contractors Licensing Act of 1994, TCA Section 62-6-101 et seq. The name, license number, expiration date thereof, and license classification of the contractors applying to propose for the prime contract and for the masonry project when the total cost of the masonry portion of the project exceeds one hundred thousand dollars ($100,000), and for the electrical, plumbing, heating, ventilation, air conditioning contracts, and closed loop geo-thermal heating and cooling, must appear on the outside of the envelope containing the proposal except when the proposal is in an amount less than twenty-five thousand ($25,000). Prime contractor bidders who are to perform the electrical, plumbing, heating, ventilation, air conditioning, masonry, and geo-thermal must be so designated upon the outside of the envelope. Failure of any bidder to comply therewith may void such bid and the envelope containing such bid may not be opened or considered. Further, MNAA has determined that, if the Bidder proposes to accomplish any or all of the Work under this Project which entails masonry work exceeding $100,000, and electrical, plumbing, heating, ventilation, air conditioning, and geo-thermal equal to or exceeding $25,000 in value through the utilization of Subcontractors or to accomplish with Subcontractors any other part of the Work for which the Bidder does not hold a valid Tennessee Contractor's License, then those Subcontractors must, at the time the Bid is submitted to MNAA, hold a valid Tennessee Contractor's License, current and in full force and effect in all respects, in such of the following classifications and sub-classifications as apply to the Work for which they will be subcontracted. Bids shall be submitted for the Work as indicated in the Plans and Specifications. Specifically, in referring to the Contractors Licensing Act and other applicable authorities, MNAA has determined that to lawfully propose on this Project, all Bidders and/or their subcontractors must, at the time their Bid is submitted to MNAA, hold a valid Tennessee Contractor's license, current and in full force and effect in all respects, to perform the Work as defined in the plans and bidding and contract documents. All Bidders are advised that the Contractors Licensing Act establishes only the minimum licensing requirements and that MNAA reserves the right in its sole discretion to require higher licensing standards, as reflected in the Contract Documents. All Bidders are responsible for complying with any other licensing or permit requirements of the State of Tennessee and/or the Metropolitan Government of Nashville and Davidson County, which may be applicable to the Work SMALL MINORITY WOMAN-owned BUSINESS ENTERPRISE (SWMBE) PARTICIPATION. It is the MNAA's objective to promote, encourage, and stimulate participation of local, small, minority and woman-owned business enterprises (SMWBE) within its organization and the economic community served by it so as to provide maximum opportunities to participate in contracts, programs and all related business activities of the MNAA. MNAA will apply the local small minority woman business participation levels where expenditures and purchases are made with non-federal funding, and to all contracts, leases, management agreements, consultants, prime contractors, subcontractors, respondents, bidders, or proposers involved in the performance of a commercially useful task for MNAA. Bidders are encouraged to meet SMWBE participation levels established by the Director, Business Diversity Development, or, if unable to meet the participation level, engage in good faith efforts to joint venture, subcontract, or contract for supplies or services with SMWBEs. The attainment of the SMWBE participation level established for this contract is to be measured as a percentage of the total dollar value of the contract. The SMWBE participation level established for this Contract will be 3.91% MBE and/or WBE. This program maintains a list of certified SMWBEs, which can be found on the portal MNAA proposes to award the Contract to the lowest responsive and responsible Bidder, provided it has met the goals for SMWBE participation or, if failing to meet the goals, has made an acceptable good faith effort to meet the established goals for the SMWBE participation. Bidder is advised that MNAA reserves the right to reject any and all Bids submitted, to waive any and all informalities, irregularities and/or technicalities in any Bid or Bid Guaranty, to accept any Bid deemed advantageous to it and to negotiate changes, deletions, or additions to these Contract Documents with the successful Bidder.

Post-Bid

Transportation Terminals

$2,603,945.00

Public - City

Renovation

42

25

2

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Glazing
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Acoustical Ceilings, Flooring, Wood Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Panel Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Printers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Fixtures
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Network Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Lighting, Interior Lighting, Special Purpose Lighting, Obstruction Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Pathways for Communications Systems, Data Communications, Data Communications Peripheral Data Equipment, Printers
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation Construction and Equipment, Transportation Equipment
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Conveyors, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Hooks

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
34
Bidding Soon
651
All Active Projects
291
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2022

February 1, 2023

img_map_placeholder

1370 Murfreesboro Pike, Nashville, TN


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

MU1 & MU2 Make-Up Carousel Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.