BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Monticello, Kentucky. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This document constitutes a Request for Proposals for a Professional Service Contract from qualified individuals and organizations to furnish those services as described herein for the Commonwealth of Kentucky, Department of Highways. Project Manager - Joseph Gossage, P.E. User Division - Highway Design Approximate Fee - $500,000 Preliminary Engineering & Environmental Services (Lump Sum) Project Funding - SPP State Funds Project Length - Approximately 3.061 miles The purpose is to reduce congestion and improve safety, capacity, and mobility along KY-90 between the Wayne County Line and the New Cumberland River Bridge. The project is needed because this section of KY-90 has a high number of access points and intersections, combined with geometric and sight distance issues. These issues, combined with a 55-mph speed limit, result in areas with higher-than-expected crash rates and some lower levels of service. The Consultant team may include a DBE Participation Plan with their Response to Announcement to help the Department meet the 11.95% DBE goal established by FHWA. The plan would demonstrate how DBE companies will be mentored or used to assist in the area(s) pertaining to this contract. If included, an additional page will be allowed in the Project Approach (Section 7) to exhibit this plan. No additional points will be provided in the Evaluation Factors for the DBE Participation Plan. First Selection Meeting: October 10, 2022 Final Selection: October 26, 2022 Pre-Design Conference: November 2, 2022 Consultant Fee Proposal: November 11, 2022 Contract Negotiations: November 23, 2022 Notice to Proceed: December 14, 2022 The method of contractor selection has not been determined at this time.

Conceptual

Roads / Highways

$300,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
101
Bidding Soon
801
All Active Projects
362
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 14, 2022

img_map_placeholder

KY-90, Monticello, KY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.