BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Webster City, Iowa. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Bids rejected per city The Lincoln Drive Reconstruction Project is located on Lincoln Drive east of the Hillcrest Drive intersection, approximately 1100' to the east terminus, within the City of Webster City. The project consists of approximately 2370 LF of curb and gutter, 1345 tons of HMA Pavement Standard Traffic 1/2 Inch Mix, PG 58-28S; 396 SY of PCC driveway pavement; 5100 SY of subbase preparation; 5100 SY of 8" modified subbase; spot repair of 8" sanitary sewer; 111 LF 15" Class III RCP trenched storm sewer; 167 LF of 24" Class III RCP trenched storm sewer; 110 LF of trenchless 12" PVC storm sewer; 2935 LF of subdrain with cleanouts and connections; 979 LF CIPP Main Lining, UV Cure, 8" Dia. and related televising and service reinstatement; replacement of 10 each sanitary sewer service stubs, 4" dia.; 1135 LF 8" PVC water main with fittings; 5 each 8" gate valves; 18 each 1" water services; 4 each fire hydrants; 43 VF Centrifugally Cast Cementitious Mortar Lining With Epoxy Seal; temporary traffic control, erosion control and seeding, and various related removals and improvements. Each Bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful Bidder will enter into a Contract for the work bid upon and will furnish after the award of Contract a corporate Surety Bond, in a form acceptable to the City of Webster City, for the faithful performance of the Contract, in an amount equal to one hundred percent (100%) of the amount of the Contract. The Bidder's security shall be in the amount fixed in the Instructions to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a Bid Bond on the form provided in the Contract Documents with corporate Surety satisfactory to the City of Webster City. The bid shall contain no condition except as provided in the specifications . Each successful Bidder will be required to furnish a corporate Surety Bond in an amount equal to one hundred percent (100%) of its Contract price. Said Bond shall be issued by a responsible Surety approved by the City of Webster City and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the City of Webster City from claims and damages of any kind caused by the operations of the Contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of two (2) years from and after acceptance of the Contract. The Notice to Proceed is anticipated to be issued after satisfactory review of executed bonds, insurance, and contract, in the spring of 2023 with a late start date of May 2, 2023. The Contractor shall fully complete the project within 80 Working Days. Fully completion includes having all pavement, driveways, roadway signage, utility adjustments, and site restoration and ALL work areas open to use by the public. Work once commenced shall be diligently worked to completion. Should the Contractor fail to fully complete the work within the time allotted, liquidated damages of One Thousand Dollars ($1,000) per working day shall be applied for each calendar day until the work is fully complete. The City of Webster City does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City. This Notice is given by authority of the City Council of the City of Webster City, Iowa. As of August 22, 2023, no new information available

Final Planning

Roads / Highways

$1,376,377.00

Public - City

Paving, Site Work

58

6

2

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
41
Bidding Soon
473
All Active Projects
270
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2022

November 27, 2023

img_map_placeholder

Lincoln Dr, Webster City, IA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.