BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Pendleton, Oregon. Completed plans call for site work for a water / sewer project.

SE 3rd Street Water Line Project. The Oregon Standard Specifications for Construction (ODOT/APWA) latest revision, excluding Sections 00100 and 00745.95, and the City of Pendleton Standard Specifications will apply to all construction work not noted in the Special Specifications. It is the Contractor's responsibility to obtain the latest revisions made to these specifications (latest revisions to City Standard Specifications, January 2001 with minor revisions 2001, 2004, 2005, 2006 and 2012). All bidders must be prequalified for the class of work included in this bid document in accordance with the laws of the State of Oregon. Each Bid Proposal must be submitted on the prescribed form (Section 3.00) accompanied by a certified or cashier's check drawn from an Oregon Bank in good standing, or banks doing business in Oregon in good standing, or a Bid Bond issued by a surety company authorized to issue such bonds in the State of Oregon, payable to the City of Pendleton, Oregon, in an amount not less than of the total amount of the Bid submitted. All bidders must comply with ORS Chapter 279C and pay applicable prevailing wage rates in effect on July 1, 2022, including any amendments, as stated in the Prevailing Wage Rates for Public Works Contracts in Oregon published by the Oregon Bureau of Labor and Industries. In addition to required performance bonds which may be used for unpaid wages, all contractors, subcontractors and non-construction companies working on public works projects, with a contract price that exceeds $100,000, subject to the Prevailing Wage Rate law, must file a $30,000 Public Works Bond with the Construction Contractor's Board before starting work on the project, unless exempt, to be used exclusively for unpaid wages determined to be due by BOLI .{ORS 279C.830 and ORS 279C.836} (See forms included in Section 5.00) Each bidder must identify whether they are a resident bidder as defined in ORS 279A.120. (Preference for Oregon goods and services). In addition to required performance bonds which may be used for unpaid wages, all contractors, subcontractors and non-construction companies working on public works projects, with a contract price that exceeds $100,000, subject to the Prevailing Wage Rate law, must file a $30,000 Public Works Bond with the Construction Contractor's Board before starting work on the project, unless exempt, to be used exclusively for unpaid wages determined to be due by BOLI .{ORS 279C.830 and ORS 279C.836} (See forms included in Section 5.00) Each bidder must identify whether they are a resident bidder as defined in ORS 279A.120. (Preference for Oregon goods and services). Installation of 740 linear feet (LF) of 18-inch water main and 640 LF of 12-inch water main on SE 3rd Street from the cul-de-sac north of SE Byers Avenue to SE Frazer Avenue. The new 12-inch water main will connect to two existing 12-inch water mains in the cul-de-sac and extend to SE Byers Avenue and make a connection with a 12-inch water main the City has already installed. New 12-inch water main will be installed between SE Byers Avenue and SE Court Avenue with 12- and 18-inch connections to existing. New 18-inch water main will be installed between SE Court Avenue and SE Dorion Avenue and between SE Dorion Avenue and SE Emigrant Avenue with 18-inch connections to existing. A new fire hydrant will be installed at the cul-de-sac and a fire hydrant will be replaced at the SE corner of SE Court Avenue. The Contractor shall have the option of installing PVC or ductile iron water line of the type and class specified in the Bid Proposal. The City will tap the water main for the water services; however, the Contractor will be required to dig and backfill trenches and must coordinate with City crews to install the service. The Contractor will be required to make connections and install the 6-inch fire service lines. The City will provide specific fittings for this project. Fittings supplied by the City are identified on the Bid Proposal. The Contractor shall be required to provide all other materials including the MegaLug restraints required for the MJ fittings the City provides. The Bidder agrees that if this Proposal is accepted, Bidder will, within ten (10) calendar days after notification of acceptance, execute the Contract with the City of Pendleton, Oregon, in the form of Contract annexed thereto, and will, at the time of execution of the Contract, deliver to the City of Pendleton, the Performance Bond required herein, and will to the extent of his Proposal, furnish all machinery, tools, and apparatus and other means of construction and do all the work and furnish all the materials necessary to complete the work in the manner and in the time and according to the methods as specified in the Contract Documents and required by the Engineer there under. The Bidder agrees to complete the work identified for each schedule of work at the option of the City of Pendleton. The City, at its sole discretion, will identify and select the schedules of work that best fit the City's budget for this work. The Bidder further proposes to accept as full payment for the work proposed herein the amount computed under the provisions of the Contract Documents and based on the following unit price amounts, it being expressly understood that the unit prices are independent of the exact quantities involved, that they represent a true measure of the labor and material required to perform the work, including all allowances for overhead and profit for each type and unit of work called for in these Contract Documents. The Contract will be awarded based on bids. City reserves the right to award or reject the bids that are in the best interest of the City. The purpose of this Project is to install 740 linear feet (LF) of 18-inch water main and 640 LF of 12-inch water main on SE 3rd Street from the cul-de-sac north of SE Byers Avenue to SE Frazer Avenue. The new 12-inch water main will connect to two (2) existing 12-inch water mains in the cul-de-sac and extend to SE Byers Avenue and make a connection with a 12-inch water main the City has already installed. New 12-inch water main will be installed between SE Byers Avenue and SE Court Avenue with 12- and 18-inch connections to existing. New 18-inch water main will be installed between SE Court Avenue and SE Dorion Avenue and between SE Dorion Avenue and SE Emigrant Avenue with 18-inch connections to existing. A new fire hydrant will be installed at the cul-de-sac and a fire hydrant will be replaced at the SE corner of SE Court Avenue. The Contractor shall have the option of installing PVC or ductile iron water line of the type and class specified in the Proposal. The City will tap the water main for the water services; however, the Contractor will be required to dig and backfill trenches and must coordinate with City crews to install the service. The Contractor will be required to make connections and install the 6-inch fire service lines. The City will provide specific fittings for this project. Fittings supplied by the City are identified on the Proposal. The Contractor shall be required to provide all other materials including the MegaLug restraints required for the MJ fittings the City provides.

Award

Water / Sewer

$643,346.00

Public - City

Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
22
Bidding Soon
302
All Active Projects
101
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2022

November 10, 2022

img_map_placeholder

SE 3rd St, Pendleton, OR


Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.