BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting and renovation of a mixed-use development in Council Grove, Kansas. Working plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; for the renovation of a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

1. Action Code: This is a Pre-Solicitation notice. 2. Date: 19 September 2022 3. Contracting Office Address: USACE CEST-CT-E 2488 E. 81st Street Tulsa, Oklahoma 74137-4290 4. Classification Code: Y - Construction of Structures and Facilities 5. Subject Title: Installation of Campground Infrastructure and Associated Features in Numerous Park, Council Grove Lake, KS 6. Solicitation Number: To be determined 7. Contact(s) Points: Name Ronica R. Smith Shawn Brady Phone 918-669-4386 918-669-7670 Email ronica.r.smith@usace.army.mil shawn.brady@usace.army.mil 8. Important: This notice does not constitute a request for proposal, request for quote, or invitation for bid. The intent of this notice is to provide the pre-solicitation notice required by FAR 5.2- Synopsis of Proposed Contract Actions in preparation for release of the Request for Proposal (RFP) later date. 9. Description: The RFP for this project is expected to be issued on or about beginning of 1 October 2022. The Proposal due date is planned on or about, end of July 2022. The North American Industry Code Standard (NAICS) is 2336220 - Commercial and Institutional Building Construction, and the size standard is $39,500,000.00. No formal source selection, listed under FAR part 15, will be used for this requirement. This requirement will be awarded to the lowest priced quote meeting or exceeding the acceptability standards and time frame specified in the solicitation. Price and Past Performance will be evaluated in accordance with in DFARS 213.106-2(b)(i)(B)&(C). BASE BID - the contractor shall install (3) pole mounted, solar-powered street light fixtures in Outlet Park providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #1 - the contractor shall construct retaining walls and parking pad in Kit Carson Park (site #1) providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #2 - the contractor shall install (4) 50 amp electric pedestals in Richey Cove Park (sites 1- 4) providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #3 - the contractor shall install (2) 50 amp electric pedestals in Canning Creek Park (sites #18-19) providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #4 - the contractor shall install (9) 50 amp electric pedestals in Santa Fe Trail Park (sites 1-9) providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #5 - the contractor shall install (4) 50 amp electric pedestals in Santa Fe Trail Park (sites 10- 13) providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #6 - the contractor shall install (8) 50 amp electric pedestals in Santa Fe Trail Park (sites Group Camping Site #5-12) providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #7 - the contractor shall install (3) 50 amp electric pedestals in Santa Fe Trail Park (sites 15-17) providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #8 - the contractor shall install (6) 50 amp electric pedestals in Canning Creek Park (sites 1-6) providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #9 - the contractor shall install new metal roofing on the south Shower House in Canning Creek Park providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. The contractor shall make all necessary arrangements for utility line locations. A 10. Place of Contract Performance: All work is located at Council Grove Lake, north of the city of Council Grove, in Morris County, Kansas. 11. Set Aside Status: This is a Small Business Set Aside 12. Additional Details: THIS SOLICITATION WILL BE OFFERED IN ELECTRONIC FORMAT ONLY. NO HARD COPIES WILL BE PROVIDED. Offerors can view and/or download the RFP and attachments at https://www.beta.sam.gov when the RFP is posted. Interested parties can register under the Interested Vendors List at FBO. This will be the only method of amendment distribution; therefore, it is the OFFERORS' RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Prospective Offerors must also be registered with the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM in order to participate in this procurement. 13. Period of Performance (POP): The POP is estimated for 120 days after the award of contract. The method of contractor selection has not been determined at this time.

Final Planning

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - Federal

Outdoor Lighting, Paving, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
27
Bidding Soon
301
All Active Projects
128
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2022

img_map_placeholder

Multiple Locations, Council Grove, KS

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.