Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving, outdoor lighting and renovation of a mixed-use development in Council Grove, Kansas. Working plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; for the renovation of a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
1. Action Code: This is a Pre-Solicitation notice. 2. Date: 19 September 2022 3. Contracting Office Address: USACE CEST-CT-E 2488 E. 81st Street Tulsa, Oklahoma 74137-4290 4. Classification Code: Y - Construction of Structures and Facilities 5. Subject Title: Installation of Campground Infrastructure and Associated Features in Numerous Park, Council Grove Lake, KS 6. Solicitation Number: To be determined 7. Contact(s) Points: Name Ronica R. Smith Shawn Brady Phone 918-669-4386 918-669-7670 Email ronica.r.smith@usace.army.mil shawn.brady@usace.army.mil 8. Important: This notice does not constitute a request for proposal, request for quote, or invitation for bid. The intent of this notice is to provide the pre-solicitation notice required by FAR 5.2- Synopsis of Proposed Contract Actions in preparation for release of the Request for Proposal (RFP) later date. 9. Description: The RFP for this project is expected to be issued on or about beginning of 1 October 2022. The Proposal due date is planned on or about, end of July 2022. The North American Industry Code Standard (NAICS) is 2336220 - Commercial and Institutional Building Construction, and the size standard is $39,500,000.00. No formal source selection, listed under FAR part 15, will be used for this requirement. This requirement will be awarded to the lowest priced quote meeting or exceeding the acceptability standards and time frame specified in the solicitation. Price and Past Performance will be evaluated in accordance with in DFARS 213.106-2(b)(i)(B)&(C). BASE BID - the contractor shall install (3) pole mounted, solar-powered street light fixtures in Outlet Park providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #1 - the contractor shall construct retaining walls and parking pad in Kit Carson Park (site #1) providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #2 - the contractor shall install (4) 50 amp electric pedestals in Richey Cove Park (sites 1- 4) providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #3 - the contractor shall install (2) 50 amp electric pedestals in Canning Creek Park (sites #18-19) providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #4 - the contractor shall install (9) 50 amp electric pedestals in Santa Fe Trail Park (sites 1-9) providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #5 - the contractor shall install (4) 50 amp electric pedestals in Santa Fe Trail Park (sites 10- 13) providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #6 - the contractor shall install (8) 50 amp electric pedestals in Santa Fe Trail Park (sites Group Camping Site #5-12) providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #7 - the contractor shall install (3) 50 amp electric pedestals in Santa Fe Trail Park (sites 15-17) providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #8 - the contractor shall install (6) 50 amp electric pedestals in Canning Creek Park (sites 1-6) providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. Option #9 - the contractor shall install new metal roofing on the south Shower House in Canning Creek Park providing all the materials, labor, tools, and equipment necessary for site preparations and installation in accordance with these contract specifications. The contractor shall make all necessary arrangements for utility line locations. A 10. Place of Contract Performance: All work is located at Council Grove Lake, north of the city of Council Grove, in Morris County, Kansas. 11. Set Aside Status: This is a Small Business Set Aside 12. Additional Details: THIS SOLICITATION WILL BE OFFERED IN ELECTRONIC FORMAT ONLY. NO HARD COPIES WILL BE PROVIDED. Offerors can view and/or download the RFP and attachments at https://www.beta.sam.gov when the RFP is posted. Interested parties can register under the Interested Vendors List at FBO. This will be the only method of amendment distribution; therefore, it is the OFFERORS' RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Prospective Offerors must also be registered with the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM in order to participate in this procurement. 13. Period of Performance (POP): The POP is estimated for 120 days after the award of contract. The method of contractor selection has not been determined at this time.
Final Planning
Playgrounds / Parks / Athletic Fields
$500,000.00
Public - Federal
Outdoor Lighting, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2022
Multiple Locations, Council Grove, KS
Related To This Project
Council Grove, KS
Bid Date: Jan 20 2023
Council Grove, KS
Bid Date: Apr 04 2023
Council Grove, KS
Bid Date: May 30 2023
Council Grove, KS
Bid Date: Sep 05 2023
Concrete Work (Concrete Paving for Stage, Apron, and Stairs) at the Riverwalk Amphitheater - 4330192
Council Grove, KS
Bid Date: Apr 20 2021
Council Grove, KS
Bid Date: Mar 04 2024
Council Grove, KS
Bid Date: Apr 17 2024
Council Grove, KS
--
Council Grove, KS
Bid Date: Mar 20 2019
Council Grove, KS
Bid Date: Apr 11 2020
Council Grove, KS
Bid Date: Jul 31 2020
Council Grove, KS
Bid Date: Dec 15 2022
Olathe, KS
--
Edgerton, KS
--
Kansas City, KS
Bid Date: May 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.