BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 24, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Downey, California. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

The work to be performed under this Contract generally consists of the construction of water system improvements on 4th Street from Paramount Boulevard to La Reina Avenue, as shown on the contract plans. The work to be performed generally consists of potable water main improvements including the installation of new main, fire hydrant assemblies, water service lines, meters and boxes; installation of gate valves, cross, tees, bends, thrust blocks, and fittings; abandoning of existing water mains, service lines, and other associated facilities; removal and salvaging of existing fire hydrant assemblies, existing water meters, and boxes; clearing and grubbing; trenching, backfilling and compacting; asphalt concrete (AC) pavement reconstruction; reconstruction of miscellaneous PCC improvements, landscaping, irrigation, and other existing improvements disturbed during the course of construction; traffic control; and all labor, tools, materials, equipment, and appurtenant work thereto necessary for the proper construction of the contemplated improvements, in accordance with Plans and Specifications entitled Capital Improvement Bid Bond 10.00%, Payment Bond 100.00%, Performance Bond 100.00%. License Requirements A or C34 Start/Delivery Date April 17, 2023 Project Duration 60

Award

Water / Sewer

$633,700.00

Public - City

Paving, Site Work

8

16

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
581
Active Projects
165
Bidding Soon
3,850
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2023

May 1, 2023

Project location map

4th St, Downey, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.