BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Jackson, Mississippi. Completed plans call for site work for a water / sewer project.

As of December 29, 2022, project was awarded but awarded amount is not available. Manufacture and deployment of concrete/limestone structures for artificial reef development. The MDMR reserves the right to reject any and/or all bids and to waive any informalities. The scope of work for the contract will include, but is not limited to, the following: The Contractor will be responsible for creating new reefs at Cat Island and the barrier islands located at FH 8, FH 9/11, and FH 10, which can be found in Attachment A. The new reefs will be comprised of materials of design and will be deployed in permitted areas. The Contractor must meet with MDMR representatives to discuss all aspects of the agreement prior to beginning any work. The date and time of the meeting will be set by mutual agreement following award of the contract. o The Contractor must provide the MDMR with the name(s) and phone number(s) of the person(s) who will be the official contact(s) for the Contractor. o The Contractor must provide a list of the exact equipment that will be used to transport and deploy the reef material. The MDMR reserves the right to inspect all equipment prior to any deployment. o The MDMR will provide Global Positioning System (GPS) coordinates and a map of deployment locations. o An MDMR representative will be onsite to monitor and oversee that the reef material is being deployed at the MDMR specified locations. o The Contractor must notify MDMR twenty-four (24) hours prior to the Contractor's departure to the artificial reef site. o All deployment activities must be conducted Monday through Friday between 8:00 a.m. and 5:00 p.m. No deployments may be made on weekends or on state and federal holidays. o In the event that the weather and/or other environmental conditions are deemed unsuitable for deployment by MDMR, the MDMR reserves the right to either cancel or postpone the deployment. There will be NO deployment activity during a Small Craft Advisory or greater. o The Contractor will have a maximum of nine (9) to twelve (12) months to complete the project. This does not include delays caused by severe weather, including but not limited to, small craft advisory or greater. o The Contractor must start the project within ninety (90) calendar days of receipt of the fully executed contract. o The Contractor must ensure that all equipment used on this project complies with Occupational Safety and Health Administration (OSHA) and United States Coast Guard requirements. The Contractor may be required to provide MDMR with documents evidencing this compliance. o Bidding will be price per unit manufactured and deployed with the expectation of at least two hundred (200) units being produced. o Additional duties may be requested and mutually agreed upon by both the Contractor and the MDMR staff in accordance with the scope and services of this contract. Questions Submission Deadline Answers Posted October 4, 2022 10:00 AM CST

Award

Water / Sewer

$400,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
11
Bidding Soon
220
All Active Projects
94
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

January 30, 2023

img_map_placeholder

501 N West St, Jackson, MS

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.