BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Palm Springs, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Work comprises of the intersection of Racquet Club Road and Via Miraleste in the City of Palm Springs. The Work includes ADA ramp, curb, gutter, striping, and a new HAWK traffic signal at the intersection. Removals and reconstruction of existing ramp features is included. The work shall be diligently prosecuted to completion before the expiration of: 90 Calendar days. BID SECURITY: each bid shall be accompanied by proof of a certified or cashier's check or Bid Bond in the amount of 10 percent of the total bid price payable to the City of Palm Springs. BIDS TO REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for a period of 120 calendar days from the date of bid opening. CONTRACTOR'S LICENSE CLASSIFICATION: The Contractor shall possess a valid Class A Contractor license at the time of submitting bids. CALIFORNIA WAGE RATE REQUIREMENTS: The Contractor shall pay the general prevailing rate of per diem wages as determined by the Director of the Department of Industrial Relations of the State of California for the locality where the work is to be performed. All contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (via the Division of Labor Standards Enforcement) as further described in Article 5 of the Construction Contract (Mutual Obligations). A copy of said wage rates is available on-line RETAINAGE FROM PAYMENTS: The Contractor may elect to receive 100 percent of payments due under the Contract Documents from time to time, without retention of any portion of the payment by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code. All questions about the meaning or intent of the Bid Documents are to be directed to the City Engineer. Questions shall be submitted in writing in online. Questions submitted after 3:00pm on OCTOBER 18, 2022, will not be accepted. The Engineer's estimate range is $230,000.

Bid Results

Roads / Highways

$363,789.00

Public - City

Paving, Site Work

5

7

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
163
Bidding Soon
2,049
All Active Projects
948
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 25, 2022

November 24, 2022

img_map_placeholder

E Racquet Club Rd & N Vía Miraleste, Palm Springs, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.