BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2022 at 8:00 PM

Updated January 25, 2024

Site work for a golf course in Tampa, Florida. Completed plans call for site work for a golf course.

Purpose: The primary objectives of the project scheduling program arc to plan the construction activities so they may be prosecuted in an orderly and expeditious manner, utilizing CPM (Critical Path Method) scheduling methods, to provide optimum coordination between contractors, to establish the basis for measuring and monitoring individual contractor progress and overall project progress, and to detect problems for the purpose oftaking corrective action. Policy: The Contractor shall prepare a comprehensive Contractor's Detailed Schedule utilizing CPM methods covering the entire scope of his responsibilities. The schedule shall present the Contractor's intended pace and order of work. The Contractor shall also submit required Cost Loading needed to analyze job progress. This schedule shall be submitted to the Owner for review and acceptance. The schedule shall be developed by the Contractor to meet project milestones as defined in the Owner-Contractor Agreement. D. The Contractor shall prepare a Contractor Detailed Schedule produced in both network CPM and bar chart format. The network shall be a CPM (Critical Path Method) using the CPM software

Award

Golf Course

$595,999.00

Public - City

Site Work

21

10

2

6

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
334
Active Projects
158
Bidding Soon
2,547
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2022

November 28, 2022

Project location map

7910 N 30th St, Tampa, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.