BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Lakewood, California. Completed plans call for site work for a educational facility.

Provide construction services for the installation of (8) total DSA Approved 30'x40' Fabric Shade Structure Projects located at Bancroft, Cleveland, Holmes, Hoover, Keller, Marshall, Newcomb and Riley, per the bid documents and specifications. The scope of work will include but no limited to the installation of (4) steel posts into asphalt, concrete or grass areas, installation of the fabric shade, possible path of travel and ADA accessibility upgrades requested by DSA. Each site is site specific and may require additional demo, added concrete pads, drinking fountains, etc. Project Type Bid Response Types Line Items Type of Award Lump Sum License Requirements B License. All contractors and subcontractors must maintain the valid/active license throughout the duration of the project. Bid Valid 90days Liquidated Damages $1,000/day Estimated Bid Value $800,000 Start/Delivery Date 10/24/22-7/1/23 Project Duration 250 consecutive calendar days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% ESTIMATED PROJECT COST: $800,000 Locations- Bancroft Middle School - 5301 E Centralia St Long Beach, CA 90808 Cleveland Elementary School - 4760 Hackett Ave Lakewood, CA 90713 Holmes Elementary School - 5020 Barlin Ave Lakewood, CA 90712 Hoover Middle School - 3501 Country Club Dr Lakewood, CA 90712 Keller Dual Immersion Middle School - 7020 E Brittain St Long Beach, CA 90808 Riley Elementary School - 3319 Sandwood St Lakewood, CA 90712 Newcomb Academy - 3351 Val Verde Ave, Long Beach, CA 90808 Selective demolition and construction necessary for the Esser Shade Structures, Phase 1, Group 2, at Cleveland Elementary School, Holmes Elementary School, Riley elementary School, Bancroft Middle School, Hoover Middle School, Keller Middle School, Marshall Middle School, and Newcomb Academy, including associated civil, architectural, structural, plumbing, and/or electrical work as indicated in the Drawings and Specifications. Generally, these categories of work involve new finishes, adaptive reuse and modification of certain selected areas, handicap accessibility retrofits, changing and expanding selected infrastructure utilities

Under Construction

Educational

$695,000.00

Public - City

Site Work

114

7

14

6

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
110
Bidding Soon
2,340
All Active Projects
921
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2022

October 24, 2022

img_map_placeholder

Multiple Locations, Lakewood, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.