BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and renovation of a civil project in Fountain Valley, California. Completed plans call for site work for a road / highway; for paving for a road / highway; for the renovation of a water / sewer project; and water / sewer project.

The Fullerton Kimberly Well 1A Well Rehabilitation project generally consists of the following major components : 1. Rehabilitation (redevelopment) of City water supply well number 1A. 2. Furnish and install a new well pump and motor. 3. Well 1A Structural Concrete: Construct structural concrete at the Kimberly Well 1A site for the new Well 1A well base. 4. Connect to the existing Water Treatment Plant: Furnish and install epoxy lined and coated above ground piping. 5. Paving and Site Improvements: Grading and Asphalt Paving at the Well 1A site. 6. Electrical and Instrumentation: Electrical equipment and facilities, and instrumentation equipment and facilities at the Well 1A site. Instrumentation and control systems shall be coordinated with the City s Controls Integrator. 7. Provide all commissioning and start-up-services. The District Project Manager will also discuss the role and participation of potential bidders in the District s Contractor Safety Program. Also, as a part of this program, the OCWD Pre-Award Safety Review form (Appendix A of the Contractor Safety Procedures) will be discussed in greater detail. All Work must be substantially completed within Three Hundred Thirty (330) consecutive calendar days from the date of the Notice to Proceed issued by the District. Failure to complete the Work within the time set forth herein will result in the imposition of liquidated damages for each day of delay, in the amount set forth in the Information for Bidders. Each Bid shall be accompanied by one of the following: a certified or cashier's check, or bid bond in an amount not less than ten percent (10%) of the total bid price, payable to the Orange County Water District, as a guarantee that the Bidder, if its Bid is accepted, shall promptly execute the Agreement, furnish a satisfactory Faithful Performance Bond in an amount not less than one hundred percent (100%) of the total bid price, furnish a Labor and Material Bond in an amount not less than one hundred percent (100%) of the total bid price, and furnish certificates evidencing that the required insurance is in effect in the amounts set forth in the Insurance Conditions. The Faithful Performance Bond shall remain in full force and effect through the guarantee period as specified in the General Provisions. All surety companies shall be admitted surety insurers and shall comply with the provisions of Code of Civil Procedure Section 995.630. As required by Section 1773 of the California Labor Code, the Director of the Department of Industrial Relations of the State of California has determined the general prevailing rates of wages in the locality in which the Work is to be performed. The prevailing wage determinations are available at the following web site:electronically The Contractor and any subcontractor under it shall not pay less than the specified prevailing rates of wages to all workers employed in the execution of the Contract. All questions relative to this project prior to the opening of bids shall be directed, in writing, to the Engineer for the project: At the request and expense of the successful bidder, the District will pay the amounts retained pursuant to the contract documents as security for the completion of the Work in compliance with the requirements of Public Contract Code Section 22300 and the provisions of the General Provisions pertaining to Substitution of Securities. The District has instituted a Contractor Safety Program to comply with Cal/OSHA s Multi-Employer Worksite Standards. A copy of the District s Contractor Health & Safety Handbook is appended as Exhibit B of these contract documents. Potential bidders are strongly encouraged to familiarize themselves with this handbook and complete and submit appropriate forms with their bid proposal as indicated. The Orange County Water District reserves the right to reject any or all bids, and to waive any informality in any bid. Addendum 1 has been released. please contact the owner for the information. Project no 200-09267-20001-02

Award

Water / Sewer

$1,499,900.00

Public - County

Paving, Renovation, Site Work

31

23

5

8

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
110
Bidding Soon
2,412
All Active Projects
1,054
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

December 1, 2022

img_map_placeholder

To Be Determined, Fountain Valley, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.