Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 1, 2025 at 8:00 PM
Updated October 2, 2025
Site work, paving and outdoor lighting for a mixed-use development in Tustin, California. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
This work shall consist in part of furnishing all labor, materials, tools, equipment and incidentals as required by the plans, specifications and contract documents for the above stated project. The work to be done hereunder consists of fine grading, ARHM roadway overlay, removals and adjustments, dry utilities, hardscape, landscaping and irrigation, pavement striping, signing and delineation, traffic signal installation and interconnect, street lighting, pathway lighting, and the construction of a pedestrian bridge: _ The Neighborhood D South area is generally bounded by Armstrong Ave, Warner Avenue, Airship Ave and Compass Avenue. _ The Linear Park area is generally west of Armstrong Ave and north of Airship Ave. _ Armstrong Pedestrian Bridge spans over Armstrong Avenue, southwest of Warner Avenue and north of Airship Avenue. Project Schedule (contract days): 300 Working Days. Liquidated Damages: $ 8500 / Calendar Day Bid Valid (calendar days): 60 Days Contractor's License(s):Class A Engineer's Estimate: $ 10.8 million to $12.3 Million Cashier's check or certified check, payable to the order of the City of Tustin, of not less ten percent (10%) of the bid or a bond in said amount, payable to the City of Tustin and signed by the bidder as well as a corporate surety, shall accompany the bid. Question Deadline 09/04/2025 at 10:00 AM PT. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Engineer's Estimate: $ 10.8 million to $12.3 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Custom Bid Result. Schedule "A': CT&T Concrete Paving Inc $1,514,490.00 Schedule "B": CT8iT Concrete Paving Inc. $2,652,572.37 Schedule "C" : CT&T Concrete Paving Inc. $7,767,619.46
Bid Results
Bridges / Tunnels
$11,934,681.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2025
December 1, 2025
Multiple Locations, Tustin, CA
Related To This Project
Tustin, CA
Bid Date: Aug 09 2022
Tustin, CA
Bid Date: Jan 19 2023
Tustin, CA
Bid Date: Feb 08 2023
Tustin, CA
Bid Date: Feb 09 2023
Tustin, CA
Bid Date: Feb 21 2023
Tustin, CA
Bid Date: Feb 28 2023
Tustin, CA
Bid Date: Mar 16 2023
Tustin, CA
Bid Date: Jul 06 2021
Tustin, CA
Bid Date: Jan 31 2023
Tustin, CA
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
