EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 22, 2022 at 8:00 PM

Updated January 25, 2024

Renovation of a municipal facility in Pittsfield, Massachusetts. Completed plans call for the renovation of a municipal facility.

The project consists of: Removal of existing siding, insulation, insulating sheathing and windows and replacement with new insulation, sheathing, vinyl siding and vinyl windows. Associated work on fascias, rakes, accessories, etc for a complete siding and window replacement. The work is estimated to cost $364,900. Contractor Qualification DCAMM Certificate Plan deposits may be electronically paid or by check. Otherwise the deposit shall be the property of the Awarding Authority. Additional sets may be purchased for $50.00 Bidders requesting Contract Documents to be mailed to them shall include a separate check for $40.00 per set for UPS Ground (or $65.00 per set for UPS overnight), nonrefundable, payable to cover mail handling costs. General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (considering all alternates), and made payable to the Pittsfield Housing Authority. General bidders must agree to contract with minority and women business enterprises as certified by the Supplier Diversity Office (SDO), formerly known as SOMWBA. The combined participation benchmark reserved for such enterprises shall not be less than 13.0% of the final contract price including accepted alternates. Request for waivers must be sent to DHCD (David.McClave@mass.gov) 5 calendar days prior to the General Bid date - No Waivers Will Be Granted After the General Bids Are Opened. The participation goals for this project shall be 15.3% for minorities and 6.9% for women.

Bid Results

Municipal

$197,000.00

Public - City

Renovation

8

15

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Windows, Wood Windows, Plastic Windows, Hardware, Glazing, Glass Glazing, Plastic Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
122
Bidding Soon
2,232
All Active Projects
902
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2022

November 14, 2022

img_map_placeholder

362 Columbus Ave, Pittsfield, MA


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Siding and Window Replacement - Phase 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.