Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 5, 2022 at 8:00 PM
Updated September 15, 2023
Site work for a water / sewer project in Harlan, Iowa. Completed plans call for site work for a water / sewer project.
Project is for stabilizing an eroding ditch which is encroaching on a farm field access lane and consists of clearing, grubbing, site preparation, excavation, earth fill, rip rap, seeding, fertilizing, mulching, and miscellaneous associated work. General Nature of the Public Improvement: Exchange Street Streambank Improvements - Harlan, IA. Project number is 121.0200.09A and is located east of Exchange Street near the southeast corner of town. Project is for stabilizing an eroding ditch which is encroaching on a farm field access lane and consists of clearing, grubbing, site preparation, excavation, earthfill, rip rap, seeding, fertilizing, mulching, and miscellaneous associated work Major Items of Construction: o Mobilization - 75% upon move in, 25% upon final completion. o Clearing and Bank Shaping - Trees shall be cleared between October 15, 2022 and March 31, 2023. Removal of stumps is included in this project. Stumps and other woody material shall be disposed of properly. It will be important to minimize bank disturbance in areas away from rock placement and stump removal. DO NOT place fill in the stream channel except for areas designated for rock placement. o Earthwork - Some areas of streambank are designated for sloping, use any excess material to fill and shape in areas where large stumps have been removed or cutbacks are present. o Rip Rap (Revetment Stone) - Providing a good fit to the existing stream channel and banks is more important than the exact dimensions shown on the plans. Rock should be clean with smaller stones (less than 6"), gravel, and sand removed at the quarry. o Seeding and Mulching - Note that a cool season mix is specified. Hydro-seeding is preferred
Award
Water / Sewer
$55,660.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 4, 2022
April 17, 2023
Exchange St, Harlan, IA
Related To This Project
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed