BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2022 at 7:00 PM

Updated March 20, 2024

Site work for a road / highway in Franktown, Colorado. Completed plans call for site work for a road / highway.

Region: 1 Counties: Douglas Projects: C0831-126 SH 83 El Paso County to Bayou Gulch This Project Involves Signing Improvements on SH 83 in Douglas County It is estimated that the total cost of all items in the bid will be: (X) Between $0 and $1,000,000 ( ) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,000 CODOT - 006 - Signing Improvements on SH 83 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (13.8%), WBE (6.9%), DBE (12%) Commencement date- (a) The earliest date shall be January 4, 2023 (b) The latest date shall be January 18, 2023 Static signing project within existing ROW. Most existing sign panels in the corridor will be replaced. Some existing sign posts will be replaced, but most will remain in place. New signs will be added for new functionality, such as advance intersection name signs and passing / no-passing pennant signs. A very limited number of signs will include a flashing beacon with solar power. Two Class III signs and posts will be replaced near the entrance to Castlewood Canyon State Park (MP 45.95). For most signs that'll get a new post, an 8" diameter x 30" long caisson will be drilled and poured. For the Type-Ill signs, there will be a total of four caissons on the whole project. Their size will be 24" diameter x 7' long

Award

Roads / Highways

$512,963.00

Public - State/Provincial

Site Work

59

5

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
98
Bidding Soon
1,330
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2022

January 18, 2023

Project location map

CO-83, Franktown, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.