BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Wilmington, Ohio. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The SUGAR GROVE CEMETERY EASTERN BRIDGE RECONSTRUCTION PROJECT is a design-build project. The proposed project includes construction to replace the existing deteriorating concrete arch bridge on the same general alignment of the existing bridge in Sugar Grove Cemetery in Wilmington, Ohio. Each bidder is required to furnish with its proposal, a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in Bond form shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. The successful bidder must replace the bid guaranty with a one-hundred percent Performance Bond upon award of the bid. Each Proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. The owner intends and requires that this project be completed no later than June 30, 2023. The contractor shall pay wages to laborers and mechanics at a rate not less than the minimum wages in accordance with the Prevailing Wage Schedules published by the Ohio Bureau of Wage & Hour Administration, effective during the period of the Contract, as provided for in Section 4115.16 of the Ohio Revised Code. No bidder may withdraw their bid within sixty (60) days of the actual date of the bid opening thereof. The Board of Control of the City of Wilmington reserves the right to accept the lowest and best bid, reject any and all bids, and to waive any irregularities in bids. Questions will be accepted through Thursday, October 20, 2022 at noon.

Final Planning

Bridges / Tunnels

$404,590.00

Public - City

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
54
Bidding Soon
1,347
All Active Projects
613
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2022

December 26, 2022

img_map_placeholder

297 W Truesdell St, Wilmington, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.