BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 12, 2022 at 8:00 PM

Updated September 15, 2023

Site work and new construction of a pre-engineered storage facility in Lexington, Kentucky. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

As of October 12, 2022, this project has not yet been awarded. A timeline for award has not yet been established. financially sound, and responsible firms to install a new Pre-Engineered Metal Building system for the new UK Indoor Track Facility in Lexington, Kentucky. The scope of work of this Project consists of the supply, installation and warranting of all materials and products, including all labor, superintendence, equipment, temporary power, transportation, lighting, plant and tools related to the construction of the work.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$3,000,000.00

Public - State/Provincial

New Construction, Site Work

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
134
Bidding Soon
1,509
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2022

December 6, 2022

Project location map

To Be Determined, Lexington, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.