EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 7, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Chambersburg, Pennsylvania. Completed plans call for the renovation of a educational facility.

Bids will be publicly opened and read aloud immediately after the scheduled closing time for receipt of Bids. Bids received after the above-referenced date and time shall be returned to the Bidder unopened.The projects include General Construction including ceiling replacement, painting and flooring at both buildings, window replacement at both buildings and roofing at Thaddeus Stevens. Mechanical Construction includes complete mechanical system replacement, Electrical Construction includes electrical system renovations including new lighting, electrical room upgrades and power to new mechanical systems. Miscellaneous work for general construction will include structural modifications and masonry work to support the new mechanical systems and miscellaneous finishes identified in the contract documents. Separate, sealed Bids will be received for the following Prime Contracts: Thaddeus Stevens Elementary School & District Administration Office Building 3529.2/3530-1 General Construction Thaddeus Stevens Elementary School 3529.2-2 Mechanical Construction 3529.2-3 Electrical Construction District Administration Office Building The following information shall be furnished by bidders when obtaining bidding documents: 1. Bidder's mailing address 2. Name of Bidder's representative 3. Bidder's telephone number 4. Bidder's facsimile number 5. Bidder's email address (email address used to submit the .pdfs) 6. Bidding documents requested, by Contract and Contract number Bidding document questions shall be directed to Crabtree, Rohrbaugh & Associates, Attention: Bidding Department, email: bidding@cra-architects.com. All questions pertaining to the Contract Documents, technical sections, legal documents, and bid submission shall be directed in writing to: Jeff Straub AIA, Senior Project Architect, email: jstraub@cra-architects.com. Each bid shall be accompanied by bid security in an amount equal to ten percent (10%) of the Base Bid amount and all alternate bid amounts in the form of a Bid Bond as described in the Supplementary Instructions to Bidders. A Performance Bond and a Payment Bond in the forms provided in the Project Manual, each in an amount equal to one hundred percent (100%) of the amount of the Contract, and each with satisfactory corporate surety, must be furnished by the successful Bidder prior to execution of a Contract. Bids may not be modified, withdrawn or cancelled by the Bidder for sixty (60) calendar days following the actual date of opening thereof, except as provided by the Commonwealth Procurement Code. However, if award of Contract is delayed by the required approval of another government agency, the sale of bonds or the award of a grant or grants, Bids may not be withdrawn by the Bidder for a period not to exceed 120 days from the date of bid opening in accordance with Pennsylvania law. Chambersburg Area School District reserves the right in its sole discretion to reject any or all Bids and to waive irregularities in any Bid. Further, Chambersburg Area School District reserves the right to award any combination of Alternates, or no Alternates, which in its sole discretion, serves the best interests of the School District. This project is subject to the Commonwealth of Pennsylvania, Department of Labor and Industry's Prevailing Wage Pre-Determination and Davis Bacon Wage Rates. Corporations seeking to bid which are organized under the laws of a State other than Pennsylvania must secure the appropriate certificate, authorizing them to conduct business within the Commonwealth. he Project consists of selective demolition renovations to (2) two buildings for Chambersburg Area School District. The (2) two schools are Thaddeus Stevens Elementary School & District Administrative Office Building. Contracts are being issued for prime as shown in 1.5.B below and separate for each school. B. Generally, the projects include General Construction including ceiling replacement, painting and flooring at all of the schools, window replacement and roofing at one school. Mechanical Construction includes complete mechanical system replacement, Electrical Construction includes electrical system renovations including new lighting, electrical room upgrades and power to new mechanical systems. Miscellaneous work for general construction will include structural modifications and masonry work to support the new mechanical systems and miscellaneous finishes identified in the contract documents. Bids shall be submitted in sealed envelopes bearing the name of the Bidder and shall be clearly marked Thaddeus Stevens Elementary or District Administrative Office Building for each separate project Bids

Post-Bid

Educational

$10,400,000.00

Public - City

Renovation

122

54

53

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Mockups, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Operation Data, Maintenance Data, Bonds, Warranties, Spare Parts, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment, Cast Underlayment, Hydraulic Cement Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Membrane Roofing, Built-Up Bituminous Roofing, Built-Up Asphalt Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Entrances and Storefronts, Windows, Hardware, Glazing, Glass Glazing, Louvers and Vents, Louvers
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Terrazzo Flooring, Wall Finishes, Special Wall Surfacing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Other Specialties, Pest Control Devices
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furnishings and Accessories, Bedroom Furnishings, Blankets, Pillows, Furniture, Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Facility Fuel Systems, Facility Fuel Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Duct Silencers, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Heating Boilers, Cast-Iron Boilers, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Ventilators, Unit Heaters, Radiant Heating Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Utility Substations
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
75
Bidding Soon
1,702
All Active Projects
752
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2022

December 1, 2022

img_map_placeholder

Multiple Locations, Chambersburg, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Renovations to Thaddeus Stevens Elementary School & District Administration Office Building

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.