Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 2, 2022 at 7:00 PM
Updated January 26, 2024
Renovation of a detention facility in Phoenix, Arizona. Completed plans call for the renovation of a detention facility.
For Adobe Mountain Juvenile Corrections Doors and Locks Upgrade This project consists of providing new upgraded Cell Doors and Shower Doors/Hardware to 4 units at the Adobe Mountain Juvenile Corrections. Construction documents prepared by Marlene Imirzian Architects & Associates and ADOA Division 1. PN - 2022- 302 Questions regarding the RFP contact the ADOA GSD Project Manager - Britt Olachea ADOA Sr. Pm. C - 602-292-6560 This Project is a Maintenance Replacement of All Cell and Shower Door(S) and Frame(S) for Adjc Adobe Mountain Facility in (4) Buildings 280 (Venture), 290 (Crossroads), 300 (Genesis) & 310 (Quest) ~ Refer to Building Key Plan for Locations. All Existing Cell and Shower Doors Are to Be Removed and Replaced for Security Purposes. Saw Cutting Of Existing Corridor Walls Will Be Required at Each Cell Door to Accom Modate the New Frame and Lock Assembly. All New Cell Doors Will Be Controlled at One Location via Control Panel in Control Room. Lock Position Will Be Lowered in Height for Staff Safety. The Shower Door and Frame Will Be Replaced And Master Keyed to Match Cell Doors. New Paint Will Be Applied to All New Doors and Frames Including Patched and Repaired Areas at Walls and Existing Transom. Add Alt #1: Door Manufacturer to Provide Cell Doors With 5 X 15" I.d. Cuff Port as Shown in Elevations. No Other Work to Be Performed.
Award
Jails / Prisons
$3,240,950.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 25, 2022
November 25, 2022
2800 W Pinnacle Peak Rd, Phoenix, AZ
Related To This Project
Phoenix, AZ
Bid Date: Oct 20 2022
Phoenix, AZ
Bid Date: Jan 17 2023
Phoenix, AZ
Bid Date: Nov 01 2022
Phoenix, AZ
Bid Date: Oct 13 2022
Phoenix, AZ
Bid Date: Oct 18 2022
Phoenix, AZ
Bid Date: Oct 18 2022
Phoenix, AZ
Bid Date: Oct 18 2022
Phoenix, AZ
Bid Date: Oct 18 2022
Phoenix, AZ
Bid Date: Oct 19 2022
Phoenix, AZ
--
Phoenix, AZ
Bid Date: Nov 02 2022
Phoenix, AZ
Bid Date: Dec 20 2022
Phoenix, AZ
Bid Date: Nov 01 2022
Queen Creek, AZ
--
Tolleson, AZ
Bid Date: Aug 30 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
