BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Phoenix, Arizona. Completed plans call for the renovation of a detention facility.

For Adobe Mountain Juvenile Corrections Doors and Locks Upgrade This project consists of providing new upgraded Cell Doors and Shower Doors/Hardware to 4 units at the Adobe Mountain Juvenile Corrections. Construction documents prepared by Marlene Imirzian Architects & Associates and ADOA Division 1. PN - 2022- 302 Questions regarding the RFP contact the ADOA GSD Project Manager - Britt Olachea ADOA Sr. Pm. C - 602-292-6560 This Project is a Maintenance Replacement of All Cell and Shower Door(S) and Frame(S) for Adjc Adobe Mountain Facility in (4) Buildings 280 (Venture), 290 (Crossroads), 300 (Genesis) & 310 (Quest) ~ Refer to Building Key Plan for Locations. All Existing Cell and Shower Doors Are to Be Removed and Replaced for Security Purposes. Saw Cutting Of Existing Corridor Walls Will Be Required at Each Cell Door to Accom Modate the New Frame and Lock Assembly. All New Cell Doors Will Be Controlled at One Location via Control Panel in Control Room. Lock Position Will Be Lowered in Height for Staff Safety. The Shower Door and Frame Will Be Replaced And Master Keyed to Match Cell Doors. New Paint Will Be Applied to All New Doors and Frames Including Patched and Repaired Areas at Walls and Existing Transom. Add Alt #1: Door Manufacturer to Provide Cell Doors With 5 X 15" I.d. Cuff Port as Shown in Elevations. No Other Work to Be Performed.

Award

Jails / Prisons

$3,240,950.00

Public - State/Provincial

Renovation

9

11

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
13
Bidding Soon
708
All Active Projects
249
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2022

November 25, 2022

img_map_placeholder

2800 W Pinnacle Peak Rd, Phoenix, AZ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.