BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Richmond, Kentucky. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Project Notes: - Substantial Date for Completion: 60 days after receipt of PO - Final Date for Completion: 75 days after receipt of PO Liquidated Damages: - $200 per day until Substantial Completion - $100 per day until Final Completion Project Description and Information: This invitation is for construction of a composting pad as specified in the following bid at Eastern Kentucky University's Meadowbrook Farm. The work includes furnishing all labor, materials, equipment and services necessary for the complete construction including all items as indicated throughout the attached specifications. Work will begin immediately following an official Award of Contract and Purchase Order from Eastern Kentucky University. A point of contact for EKU Project Management will be provided to the awarded vendor at time of award. Eastern Kentucky University reserves the right to award in part or in whole and to award multiple suppliers/contracts if in the best interest of the university. A. The EKU Meadowbrook Farm Composing Pad, located at 485 Whitt Road, Richmond, KY 40475 B. Base Bid: Project consists of grubbing site of all vegetation, leveling site with limestone base and extending base ten foot beyond concrete pad limits, compacting stone base, forming a concrete pad 120 foot wide by 150 foot long 6 inch thick minimum with 6x6 - W4xW4 wielding wire mesh reinforcing. Wire mesh shall be supported on stands or pulled into center of concrete during application. Concrete pad perimeter shall be turned down a minimum of 6 inch x 6 inch. Concrete shall be sawed within 48 hours of finishing for control joints at no more than 30 foot increments at a depth of 3 inch. Concrete shall be a 4,000 pound mix. Backfill perimeter with 4 inch of DGA stone ten foot beyond concrete pad limits minimum. C. Alternate 1: Contractor is to provide add alternate for additional concrete to the length of the pad. Alternate shall be per lineal foot of additional concrete.

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
21
Bidding Soon
504
All Active Projects
208
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2022

November 4, 2022

img_map_placeholder

485 Whitt Rd, Richmond, KY


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.