Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Utica, Mississippi. Completed plans call for site work for a water / sewer project.
**As of November 09 ,2022, project was awarded to Red Oak Construction, awarded amount is $284,728.60.** The work generally consists of repair of existing sewer services and main line point repairs, relay of mainline sewers with manholes, clean and line existing sewer line, and related items The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein. Contract time shall be 120 consecutive calendar days for Sewer Improvements from the effective date shown in the Notice to Proceed. Liquidated damages will be assessed in the amount of the actual costs incurred for each consecutive calendar day beyond the specified contract time. Special Damages: In addition to the amounts provided for liquidated damages, expenses and other losses, Contractor, in the event of such default, shall pay to the Owner the actual costs, expenses and other losses reasonably incurred by Owner. Awarding public contracts to non-resident Bidders will be on the same basis as the non-resident Bidder's state awards contracts to Mississippi Contractors bidding under similar circumstances. In order to ensure that Mississippis so called Golden Rule is followed state law requires a non-resident bidder to attach to his bid a copy of his resident states current laws pertaining to such state's treatment of non-resident contractors. Minority and women business enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities, equipment, material and/or supply needs The Town of Utica reserves the right to reject any and all bids and to waive any informalities or irregularities therein.
Award
Water / Sewer
$284,729.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 1, 2022
December 1, 2022
Multiple Locations, Utica, MS
Related To This Project
Utica, MS
Bid Date: Nov 11 2022
Utica, MS
Bid Date: May 20 2022
Utica, MS
Bid Date: Jun 28 2022
Utica, MS
Bid Date: Jun 28 2022
Utica, MS
--
Utica, MS
Bid Date: Dec 07 2020
Utica, MS
Bid Date: Jan 26 2023
Walnut, MS
Bid Date: Nov 10 2022
Mississippi State, MS
Bid Date: Oct 18 2022
Merigold, MS
Bid Date: Nov 01 2022
Brookhaven, MS
Bid Date: Oct 20 2022
Greenville, MS
Bid Date: Oct 13 2022
Long Beach, MS
Bid Date: Oct 25 2022
Pascagoula, MS
Bid Date: Oct 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.