BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Statesboro, Georgia. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The City of Statesboro Engineering Department is requesting for proposals, engineering design services for roadway profile, stormwater, and traffic flow improvements along Max Lockwood Drive. This project will consist of the construction of a two lane configuration for Max Lockwood upgrading from the current one-way road coming off of Ga Highway 67 and ending at S. Zetterower Avenue. This project will including all stormwater drainage improvements to keep runoff from infiltrating into the front of the Honey Bowen building and adjustments to the existing stormwater structures to accommodate the new lane. Design plans shall be in Georgia Department of Transportation format and all design shall be in accordance with the latest AASHTO, MUTCD and Georgia Department of Transportation Standards and Specifications. Deliverables shall include: Topographic and project survey including State Plane Coordinates Hydrology study or storm water management plan addressing all drainage needs Recorded Plats for easements and required ROW including legal descriptions. Staking of any required right-of-way and easements. Acquiring any required GDOT encroachment permits A construction cost estimate to be used for bid tabulation. The format shall be a MS Excel spreadsheet. To be submitted at completion of Preliminary Design then updated for Final Design and Construction Letting. An electronic copy of files and drawings in AutoCAD format upon acceptance of the completed plans. Complete Construction Plans in GDOT Plan Presentation Guide (PPG) Format to include: Submittals for review at 30%, 60% and 90% Cover Sheet with PE Stamp Index of Drawings General Notes Typical Sections Summary of Quantities Plan and Profile Grading and Drainage Plans Drainage Profiles Driveway Profiles Cross Sections at 50' intervals Utility Plans based on SUE Level C Signing and Marking Plans GSWCC approved Erosion Control plans in accordance with latest NPDES and Georgia EPD requirements. Construction Standards and Details Right of way plans Since this is a request for proposal (RFP) format, all submitted sealed bids shall be evaluated by the following criteria: (Submittals will be evaluated on a 100 point scale and ranked. At this point, submittals will receive and overall ranking. (Example: 1-10 in the event of 10 submittals) Experience with similar projects (Please list projects in detail) 25% Staff assigned to the project and their credentials 15% Cost 25% References complete with detailed contact information 10% Proposed methodology of project management and completion. 25% The City expects the design plans for the project to be completed by January 2023, so that any right-of-way & construction easement acquisition can take place shortly after and construction can commence as early as possible. This project is funded with City TSPLOST funds. following information clearly displayed on the outside envelope: Name of Firm Project Name Date of Proposal All questions must be submitted in writing by 5:00 PM EST on Wednesday, October 19, 2022. Please reference the name of this RFP. Questions received after this deadline will not be answered. For information regarding this process, please contact Darren Prather, Director of Central Services The method of contractor selection has not been determined at this time.

Conceptual

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
57
Bidding Soon
663
All Active Projects
316
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 25, 2022

January 25, 2023

img_map_placeholder

Max Lockwood Dr, Statesboro, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.