EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 7, 2022 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in San Francisco, California. Completed plans call for site work for a water / sewer project.

As of December 07th, 2022, project has not been awarded. It is expected to be awarded sometime after December 13th. The objective of the project rehabilitate brick sewers and laterals on Oak, Fell, Cole, Divisadero, Stanyan Street, and 7th Avenue. The work is to be performed in San Francisco, California. Delivery shall be via facsimile at: (415) 553-4896 or email to QBD@sfwater.org. The City may not answer questions received less than 10 days prior to the date for opening Bids. 121,542 When prompted, enter the meeting Passcode. To participate by phone, dial +1.213.338.8477 and enter the Meeting ID followed by # key. When prompted, enter the meeting Passcode and # key. Attendance of remote attendees will be completed at the end of the pre-bid meeting. SFPUC encourages Bidders to submit a Safety Prequalification Form at least 3-weeks prior to the date of Bid opening. Bidders are required to pass the Safety Prequalification prior to SFPUC considering their bid submission complete. SFPUC will notify Bidders who have passed the Safety Prequalification prior to or on the date of Bid opening. Refer to Section 00 21 13 - Instructions to Bidders, "Bidder Qualifications" and Section 00 45 12 - Safety Prequalification for additional information. A Class "A" California Contractors License is required to bid. Furthermore, each listed subcontractor must possess appropriate active licenses for the work each subcontractor will be performing. Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B. The Local Business Enterprise (LBE) subcontracting requirement is 4.00%. The LBE subcontracting requirement can only be met with certified San Francisco Micro and Small-LBEs. The LBE subcontractor participation requirement for this Contract is less than 20% for the following reasons: The main purpose of the project is to rehabilitate 6,500 LF of sewers on 7th Ave, Oak Street, and Fell Street. The existing sewer lines are constructed of 3x5' brick sewers, and some 6/8" VCP laterals. The CIPL rehabilitation method is a great option for areas where digging/trenching would be disruptive and impractical. The liner is inserted and using steam/water/UV, the liner is cured and forms a replacement pipe. This is specialty work that only specific Contractors with specific qualifying experiences can perform. In addition, the lining of the laterals requires a special subcontractor who can use this same technique but on a much smaller scale. SFPUC-LBEs cannot be counted towards meeting the LBE subcontracting requirement(s). Prime and Joint Venture level LBE participation cannot be counted towards meeting any of the LBE subcontracting requirement(s). LBE subcontractors must be certified with in the scope of work they are being listed to perform. All Bidders shall submit documented Good Faith efforts with their Bids as directed on Form 2B, except those who exceed the above-stated subcontracting requirement(s) by at least 35%. Refer to Attachment 1. Failure to comply with Chapter 14B requirements may result in a Bid being deemed non-responsive and ineligible for Contract award. Please contact Jason Chow at (415) 554-3103 or jason.chow@sfgov.org for further information. Subcontracting opportunities may include, but not limited, to the following major types of work: saw-cutting, paving, excavation, traffic control, and concrete.

Bid Results

Water / Sewer

$9,937,355.00

Public - City

Site Work

52

23

4

13

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Coordination, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Temporary Storm Water Pollution Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Warranties, Project Record Documents, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Gaskets
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Other Specialties, Flags and Banners, Flags
Division 11 - Equipment

Division 11 - Equipment

Collection and Disposal Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Plugging
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
119
Bidding Soon
2,023
All Active Projects
850
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2022

March 7, 2023

img_map_placeholder

Multiple Locations, San Francisco, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Panhandle and Inner Sunset Large Sewer Rehabilitation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.