BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 16, 2022 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Morgan City, Louisiana. Completed plans call for site work for a water / sewer project.

The construction of concrete foundation piles, reinforced concrete capsills and wharf dock, steel sheet pile wall, concrete paving, and other incidental items of work in connection therewith. The additional wharf deck area is approximately 300' long x 40' wide and will have capacity for a 70-ton rated crane on the west end and a 50- ton rated crane on the east end to match the load capacity of the existing dock. The transient loading zone will be paved utilizing 16" thick concrete above 12" thick stone base course. For Morgan City Rail and Dock Rehabilitation East Side Dock Expansion, Phase III

Award

Water / Sewer

$4,983,957.00

Public - City

Site Work

31

5

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
232
Active Projects
114
Bidding Soon
901
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2022

December 26, 2022

Project location map

Multiple Locations, Morgan City, LA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.