BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Milford, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Construction of: 2022 Miami Township Milford Hills Intersection Widening Project This project consists of: Under this contract the successful bidder shall furnish all labor, materials and equipment necessary for performing and completing the required improvements as stipulated in the plans and specifications. and consisting of the cover sheet, general notes with profile and estimated quantities, and the grading plan. The Contractor shall provide all the labor and furnish all the materials, except as herein otherwise specified, necessary for properly performing and completing the work per the itemized construction activities listed in the plans and on the "Quantity Estimate and Bid Tabulation" page of this document. The methods, materials, and appliances used therefore shall conform to the current edition of the State of Ohio Department of Transportation Construction and Materials Specifications. These specifications can be found on the ODOT website listed below: Note: Excavation/Embankment Payment: Payment for excavation and embankment of dirt, including any necessary haulOoff shall be incidental to the remainder of the project. Any items required, including labor, equipment, and/or materials, but not shown as a separate pay item in the proposal, shall be furnished and installed as incidental to the contract, except where noted in the plans and specifications. All work shall be completed between April 3, 2023 and June 30,2023. The Contractor shall provide all the labor and furnish all the materials necessary for properly performing and completing the work of the Contract. http://www.dot.state.oh.us/Divisions/ConstructionMgt/OnlineDocs/Pages/2019-Online-SpecBook.aspx The successful bidder must provide all materials, manpower, and equipment (including mobilization) to enlarge the radius at the northeast corner of SR 28 and Milford Hills Drive. Curb ramp and sidewalk will be replaced on the northeast side. New curb will match existing type. Utility pole on northeast corner will be relocated by the appropriate utility company. Existing pavement on Milford Hills within project limits will be milled and replaced according to the plans and specifications labeled: The Trustees reserve the right to add or delete footage and or tonnage of the project as specified in the plans.

Award

Roads / Highways

$91,645.00

Public - City

Paving, Site Work

7

5

12

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
75
Bidding Soon
1,488
All Active Projects
558
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2022

April 10, 2023

img_map_placeholder

Milford Hills Dr, Milford, OH


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.