BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Moreno Valley, California. Contact the soliciting agency for additional information.

The City of Moreno Valley proposes to improve the existing concrete walkway on the Juan Bautista De Anza Multi Use Trail from Moreno Valley Mall to Iris Avenue by constructing a multiuse concrete trail for bicyclists and pedestrians. The proposed trail will consist of a ten (10) to fourteen (14)-foot-wide Portland cement concrete (PCC) bike path adjacent to a four (4)-foot wide decomposed granite path along the Santa Ana Pipeline (SAPL). The proposed work includes, but is not limited to, the construction of AC or PCC multi-use trail; grading; excavation of earth and rock; excavation of PCC and AC; placement and compaction of fill materials and native soil; alley driveway, curb; curb and gutter; sidewalk; curb ramps; asphalt concrete paving over base; PCC pavement over base; PCC underdrain; retaining wall; handrail; drainage; pavement markings and traffic striping and markings; signage; bollards; traffic control; and landscape restoration. The project also includes high visibility crosswalks, traffic signal modification at the major street crossing, signage, and striping along the trail alignment. Contact Info Capital Projects Division 951-413-3130 techinfo-capproj@moval.org Online Q&A Yes Q&A Deadline 10/07/2022 2:00 PM (PDT) Pre-Bid Meeting No Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Start/Delivery Date Early December 2023 Project Duration One Hundred Twenty (120) Working Days for the Base Bid only, and up to One Hundred Fifty (150) Working Days for Base Bid plus Additive Alternate Bids (1 and 2) The Method of Contractor Selection has not been determined at this Time.

Conceptual

Roads / Highways

Public - City

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
121
Bidding Soon
2,154
All Active Projects
996
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2023

img_map_placeholder

Via De Anza, Moreno Valley, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.