Renovation of an educational facility in Richmond, Illinois. Completed plans call for the renovation of a educational facility.

This project includes the renovation of the existing High School Learning Resource Center and adjacent spaces; including selective demolition, carpentry, casework, doors, frames, hardware, carpet, resilient flooring, painting, acoustical ceilings and associated mechanical and electrical work. There is no cost to download the drawings, however, prospective bidders must provide all requested information when completing the download process in order that they will receive proper updates. Make proposals on the bid forms supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid, a certified check or acceptable bidder's bond payable Richmond-Burton Community High School District 157 in an amount equal to ten percent (10%) of the total bid.The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond. The successful bidder is required to pay the general prevailing wage for work as ascertained by the Illinois Department of Labor, and shall submit certified payroll records, in compliance with the Prevailing Wage Act (820 ILCS 130) and shall comply with all applicable Illinois statutory requirements regarding labor, including Equal Employment Opportunity laws. Bids may not be withdrawn within thirty (30) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. The Project consists of the construction of an interior remodeling. 1. Briefly and without force and effect upon the Contract Documents, the Work of this single prime Contract can be summarized as follows: 2. Work under this Contract includes: a. Sitework 1) Rough and finish grading, paving, concrete sidewalks and plazas, ground cover, trees and shrubs. b. Building Structure 1) Concrete footings, masonry and concrete foundation walls, concrete slabs on grade, masonry bearing walls, steel framing, precast concrete plank/concrete topping floor systems, composite steel/concrete floor systems, steel bar joist/deck and precast concrete plank roof systems, composite steel/concrete roof systems, insulated steel stud exterior bearing wall systems, and miscellaneous metal items including stairs, railings. c. Interior Finishes 1) Insulated gypsum board/metal stud partitions, and concrete block partitions. 2) Floor finishes of carpet and LVT. 3) Wall finishes of paint, vinyl wallcovering. 4) Ceiling finishes of acoustical lay-in tile, gypsum board soffits. 5) Plastic laminate casework, HM doors and frames, wood doors, hardware, glazing, acoustic treatment, markerboards, tackboards, signage, miscellaneous specialties. d. Mechanical Systems 1) Ventilation to include ductwork, duct insulation. 2) Temperature control system. 3. Electrical Systems 1) Interior lighting. 2) Low voltage wiring. 3) Fire alarm. F. Keep Architect fully informed about progress of the work, performance of the work and potential problems.

Award

Educational

$842,000.00

Public - City

Renovation

28

21

27

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Warranties, Project Record Documents, Spare Parts, Demonstration and Training, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Cast Decks and Underlayment, Concrete Topping
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Architectural Woodwork, Wood Paneling
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Joint Protection
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Tile Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Wall and Door Protection, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Runners, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Network Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
306
Active Projects
166
Bidding Soon
2,589
All Active Projects
1,301
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2022

May 31, 2023

img_map_placeholder

8311 State Rte 31, Richmond, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Richmond-Burton High School LRC Renovations

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.