BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 3, 2022 at 8:00 PM

Updated January 25, 2024

Site work and new construction of a civil project in Conroe, Texas. Working plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

As of 10/28/2022 this project has been cancelled. For your information, please contact San Jacinto River Authority The Lake Houston Pump Station (LHPS) is a critical component of the SJRA Highlands Division's raw water system. The pump station is operated 24/7, 365 days/year, in order to provide raw water to industrial, municipal, and irrigation customers in East Harris County. An existing SJRA owned operator residence at the site has reached the end of its useful life. In addition, SJRA is transitioning to remote operations of the pump station. Due to the criticality of the pump station's operations, even during significant storm events, a remote operations center is necessary in order to house staff during storm events. The project generally includes a proposed remote operations center, new utilities including septic and a water well, site security, drainage and slope protection, and other minor site improvements. In addition, the remote operations center will include a future electrical room to provide for new switchgears and appurtenances when SJRA replaces pumps and motors as part of a future project. Collectively, the proposed Remote Operations Center and various site improvements will provide for reliable and efficient operations of the LHPS. Question Cuttoff Date & Time 10/18/2022 12:00:00 PM (ET) One-Year Maintenance Bond: i. Contractor shall furnish Owner with a One-Year Maintenance Bond in the form set out in the Contract Documents. 5. Second-Year Maintenance Bond (if required): i. Contractor shall furnish Owner with a Second-Year Maintenance Bond in the form set out in the Contract Documents. ii. The Second-Year Maintenance Bond shall be in an amount equal to ten percent (10%) of the Contract Amount and shall remain in effect until 2-years from the date of Substantial Completion.

Final Planning

Water / Sewer

$2,100,000.00

Public - County

New Construction, Site Work

89

17

16

2

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
408
Active Projects
241
Bidding Soon
3,745
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2022

April 10, 2023

Project location map

To Be Determined, Conroe, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.