Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a civil project in Conroe, Texas. Working plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
As of 10/28/2022 this project has been cancelled. For your information, please contact San Jacinto River Authority The Lake Houston Pump Station (LHPS) is a critical component of the SJRA Highlands Division's raw water system. The pump station is operated 24/7, 365 days/year, in order to provide raw water to industrial, municipal, and irrigation customers in East Harris County. An existing SJRA owned operator residence at the site has reached the end of its useful life. In addition, SJRA is transitioning to remote operations of the pump station. Due to the criticality of the pump station's operations, even during significant storm events, a remote operations center is necessary in order to house staff during storm events. The project generally includes a proposed remote operations center, new utilities including septic and a water well, site security, drainage and slope protection, and other minor site improvements. In addition, the remote operations center will include a future electrical room to provide for new switchgears and appurtenances when SJRA replaces pumps and motors as part of a future project. Collectively, the proposed Remote Operations Center and various site improvements will provide for reliable and efficient operations of the LHPS. Question Cuttoff Date & Time 10/18/2022 12:00:00 PM (ET) One-Year Maintenance Bond: i. Contractor shall furnish Owner with a One-Year Maintenance Bond in the form set out in the Contract Documents. 5. Second-Year Maintenance Bond (if required): i. Contractor shall furnish Owner with a Second-Year Maintenance Bond in the form set out in the Contract Documents. ii. The Second-Year Maintenance Bond shall be in an amount equal to ten percent (10%) of the Contract Amount and shall remain in effect until 2-years from the date of Substantial Completion.
Final Planning
Water / Sewer
$2,100,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 10, 2022
April 10, 2023
To Be Determined, Conroe, TX
Related To This Project
Conroe, TX
Bid Date: Sep 02 2022
Conroe, TX
Bid Date: Oct 27 2022
Conroe, TX
Bid Date: Oct 12 2022
Conroe, TX
--
Conroe, TX
Bid Date: Oct 06 2022
Conroe, TX
Bid Date: Oct 07 2022
Conroe, TX
--
Conroe, TX
--
Conroe, TX
Bid Date: Oct 11 2022
Conroe, TX
--
Conroe, TX
Bid Date: Oct 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.