Published October 25, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Reading, Pennsylvania. Completed plans call for the renovation of a theater / auditorium.

The Santander Performing Arts Center invites Bids for the HVAC Equipment Replacement, located at 136 North 6th Street, Reading, PA 19603. Bids will be received for the following Prime Contracts: Contract No. 1: Mechanical Construction Contract No. 2: Electrical Construction Contract No. 3: General Construction All bids shall be enclosed in envelopes (inner and outer) both of which shall be sealed and clearly labeled with the words SEALED BID FOR THE HVAC EQUIPMENT REPLACEMENT AT SANTANDER PERFORMING ARTS CENTER, and the name of bidder and date and time of bid opening, in order to guard against premature opening of the bid. Facsimile bids will not be accepted or considered All bids shall remain firm for sixty (60) days following opening of bids. Each contractor and each sub-contractor shall be licensed in the community where the work will occur. The Contract will be written to retain 10% for each request for payment. When the Contract is 50% completed, one-half of the amount retained shall be returned to the Contractor. However, the Architect must approve the Application For Payment. The Contractor must be making satisfactory progress and there must be no specific cause for greater withholding. The Owner-Contractor Agreement will be the Standard Form of Agreement Between Owner and Contractor AIA Document A101, 2017 edition. The Owner requires that all Bids shall comply with the bidding requirements specified in the Instructions To Bidders. The Owner may, at its discretion waive informalities in Bids, but is not obligated to do so, nor does it represent that it will do so. The Owner also reserves the right to reject any and all Bids. Under no circumstances will the Owner waive any informality which, by such waiver, would give one Bidder a substantial advantage or benefit not enjoyed by all other Bidders Bonding companies for Performance and Payment Bonds must be listed in the U.S. Treasury Circular No. 570. A Bid Bond made payable to the Santander Performing Arts Center, in the amount of 10% of each Base Bid shall accompany each bid, executed by the Contractor and a surety company licensed to do business in the Commonwealth of Pennsylvania, as a guarantee that, if the bid is accepted, the bidder shall execute the proposed contract and shall furnish and pay for a Performance and Payment Bond in the amount of 100% of the Contract Price as security for the performance of the Contract and payment of all costs thereof, upon execution of Contract. If, after thirty days the bidder shall fail to execute said Contract and Bond, the Bid Bond shall be forfeited to the Owner as liquidated damages. The Bid Bond of all bidders, except the three low bidders, will be returned within ten (10) days after the opening of the bids. The Bid Bond of the three low bidders for each prime contract will be returned within three days after the executed Contracts and required bonds have been approved by the Owner. The successful Bidder will be required to file a Stipulation Against Mechanic's Liens prior to commencing work. Bidders can access the site by appointment only. The Bidding Documents and Forms of Proposal may be examined at the following site during regular business hours: Quad Three Group, Inc., 37 North Washington Street, Wilkes-Barre, Pennsylvania 18701, telephone 570-829-4200, facsimile 570-829-3732.

Post-Bid

Theaters / Auditoriums

$700,000.00

Public - City

Renovation

13

8

5

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Construction, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Roof and Wall Specialties and Accessories, Roof Accessories
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Access Doors and Panels, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Central Cooling Equipment, Packaged Water Chillers, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Screening Devices
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
155
Bidding Soon
2,283
All Active Projects
1,082
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2022

November 24, 2022

img_map_placeholder

136 N 6th St, Reading, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

HVAC Equipment Replacement at Santander Performing Arts Center

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.