BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for an educational facility in Spring Lake, North Carolina. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.

It is the Owner's intent to make a recommendation regarding award of these Contracts by October 18, 2022. A Notice of Intent to Award will be prepared and conveyed to the Contractor immediately. The Contractor shall commence the performance of this Contract and shall diligently continue its performance to and until final completion of the Project. Due to the hut's location and its closeness to the main building and the school being occupied with students, there will NOT be ANY demolition conducted on November 9th & 10th , 2022. Schedule of construction must be coordinated with school personnel. The Contractor shall commence work to be performed under the Contract on a date to be specified in a Notice to Proceed issued by the Owner and shall substantially complete all work in accordance with the project Time Table. If the Contractor fails to begin the work within ten days after the date specified in the Notice to Proceed, or progress of the work is not maintained on schedule, or the Contractor fails to perform the work with sufficient workmen and equipment or with sufficient materials to ensure prompt completion of the work, or shall perform the work unsuitably, or not in accordance with plans and specifications, or in violation of safety requirements or for any cause whatsoever shall not carry on the work in an acceptable manner, then the Owner shall declare this Contract in default and Owner may terminate the performance of the Contract and assume possession of the Project site and of all materials and equipment at the site and may complete the work. In such case, the Contractor shall not be paid until the work is complete. After Final Completion has been achieved, if any portion of the contract price, as it may be modified thereunder, remains after the cost to the Owner of completing the work, including all costs and expenses of every nature incurred, has been deducted by the Owner, such remainder shall belong to the Contractor. Otherwise, the Contractor shall pay and make whole the Owner for such cost. This obligation for payment shall survive the termination of the Contract. Failure of a Contractor to meet the requirements of a Contract and/or insufficient performance may disqualify Contractor from bidding future Projects. The hut is to be removed down to the footings which are to remain. The owner will cut loose the anchors just before demolition starts. Remove all foundation blocks to the footing. If any or all parts of this bid are accepted, an authorized representative of Cumberland County Board of Education shall affix their signature hereto and this document and the provisions of the Instructions to Bidders of the Instructions to Bidders, special terms and conditions specific to this Invitation To Bid, the specifications, and the North Carolina General Contract Terms and Conditions shall then constitute the written agreement between the parties. A copy of this acceptance will be forwarded to the successful bidder(s). The Cumberland County BOE reserves the right to reject any and all proposals.

Bid Results

Educational

$5,000.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
133
Bidding Soon
1,938
All Active Projects
786
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 17, 2022

November 8, 2022

November 11, 2022

img_map_placeholder

611 Spring Ave, Spring Lake, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.